Orange County NC Website
Areas of Work <br /> • Estimated total: $28.5 million <br /> • Major Infrastructure Projects <br /> – A.L. Stanback Middle <br /> – Cameron Park Elementary <br /> – Central Elementary <br /> – Efland Cheeks Elementary <br /> – Grady Brown Elementary <br /> – Hillsborough Elementary <br /> – Orange High School <br /> Areas of Work—All Schools <br /> • Food Service: $ 1.4 million <br /> • Safety: $2.7 million <br /> Area of Work—Additions <br /> Cedar Ridge High School: $14.7 million <br /> • Occupied 2002 <br /> • Design included 500 student addition <br /> • Capacity: 1000 <br /> • Current enrollment: 1149 <br /> • SAPFO projects high school capacity at 110.2% in 2022-2023 <br /> Todd LoFrese presented the following slides: <br /> CHCCS Older Facilities Summary <br /> • Older schools need significant investments <br /> • Recommendations <br /> – Fix aging infrastructure issues <br /> – Bring older schools to OC standard <br /> – Address safety and security <br /> – Increase capacity and delay new schools <br /> – Eliminate mobile classrooms <br /> – Delays operational increases <br /> CHCCS Facilities Assessment: 6 slides (charts) <br /> Pam Jones continued the PowerPoint presentation: <br /> Collaboration Opportunity <br /> • Based on $125 million Bond distributed roughly by ADM, both districts would like to <br /> jointly fund a centralized transportation maintenance center. <br /> – Efficiency <br /> – Effectiveness <br /> – Safety <br /> – Appropriate Working Conditions <br /> Todd LoFrese concluded the PowerPoint presentation: <br /> Long Term <br /> • Current Annual Pay as you Go, '/4 Cent, and Lottery <br />