Orange County NC Website
Todd LoFrese said there are significant school needs throughout the County, which he <br /> and Pam Jones would be presenting. <br /> Pam Jones and Todd LoFrese presented the following PowerPoint slides: <br /> Facilities Needs Presentation <br /> September 29, 2015 <br /> Pam Jones and Todd LoFrese <br /> Todd LoFrese presented this slide: <br /> Our Goal <br /> • Two Districts <br /> • Two Similar, but Different Set of Needs <br /> • Two Different Approaches <br /> • One Goal <br /> — To Provide: Safe, Secure, and Healthy Facilities to Support Student Learning and <br /> Achievement <br /> Pam Jones presented the following slides: <br /> Thorough, Detailed, Responsible <br /> • Process started in 2011 <br /> • Professional Architectural and Engineering Evaluation <br /> • Comprehensive recommendations, linked to Orange County School Construction <br /> Standards <br /> • Scaled back: <br /> — CHCCS original $200 million, now$160 million <br /> — OCS original $161 million, now $65 million* (Board of Education Prioritized $50- <br /> $70 million only) <br /> OCS Facilities Summary <br /> • Focus on projects not fundable through current Capital Investment Plan (CIP) allocations <br /> in these areas: <br /> — Safety <br /> — Replacement of antiquated mechanical equipment <br /> — Cedar Ridge classroom wing <br /> — Replacement of Transportation facilities <br /> — Upgrade/Replace food service facilities/equipment <br /> Areas of Work <br /> • Estimated total: $15.9 million <br /> • Major Mechanical System Replacement <br /> — A.L. Stanback Middle <br /> — Cameron Park Elementary <br /> — Central Elementary <br /> — Efland Cheeks Elementary <br /> — Grady Brown Elementary <br /> — Hillsborough Elementary <br /> — Orange High School <br />