Browse
Search
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:53:20 PM
Creation date
11/4/2015 2:32:00 PM
Metadata
Fields
Template:
Contract
Date
10/29/2015
Contract Starting Date
10/29/2015
Contract Ending Date
2/28/2016
Contract Document Type
Agreement - Construction
Amount
$201,103.00
Document Relationships
R 2015-584-E AMS - Harris Bros. Electric & Controls, Inc. to install standby generators at Whitted and Seymour
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 989208A2-AC78-4885-B25B-F162607F73BE <br /> Subbase Fuel Tank <br /> Electrical Removable Emergency Normal Law Additional fitting Power Armor Plus'coating <br /> stub-up area engine supply inner tank vent fuel level for optional for advanced corrosion and <br /> open to bottom diptube relief vent switch accessory abrasion protection <br /> 0 0 00 0 0 D Ott 0 <br /> EP <br /> i <br /> i <br /> I <br /> 1 <br /> 1 <br /> I <br /> 1 <br /> I <br /> 1 <br /> I <br /> I <br /> O I O <br /> 1 <br /> I <br /> OO® o <br /> O { ® O <br /> 1 <br /> o0 00 0 o oo 000 o G 0 0 <br /> 0 <br /> Fuel fill with <br /> Fuel leak Removable fuel lockable cap and Fuel level Emergency outer Basin <br /> detection switch return diptube 203 mm(8 in.)riser gauge tank relief vent drain <br /> EM <br /> 11 ' II 1 <br /> 0 <br /> Note: 20-40REOZJC models shown,other models are similar- Refer to the respective AQV drawings for details. ADV--7434 <br /> Standard Subbase Fuel Tank Features <br /> • Extended operation. Usable tank capacity offers full load • Emergency pressure relief vents. Vents ensure adequate <br /> standby operation of up to 72 hours. venting of the inner and outer tank under extreme pressure <br /> and/or emergency conditions. <br /> • Power Armor Plus- textured epoxy-based rubberized <br /> coating that creates an ultra-thick barrier between the tank • Normal vent with cap. Vent is raised above lockable fuel fill. <br /> and harsh environmental conditions like humidity,saltwater, <br /> and extreme temperatures, and provides advanced corrosion • Law fuel level switch. Annunciates a 50%low fuel level <br /> and abrasion protection. condition at generator set control. <br /> • UL listed. Secondary containment generator set base tank • Leak detection switch. Annunciates a contained primary tank <br /> meeting UL 142 requirements. fuel leak condition at generator set control. <br /> • NFPA compliant. Designed to comply with the installation • Electrical stub-up. <br /> standards of NFPA 30 and NFPA 37. <br /> • Integral external lift lugs. Enables crane with spreader-bar <br /> lifting of the complete package(empty tank, mounted <br /> generator set, and enclosure)to ensure safety. <br /> G&99 5l14aa Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.