Browse
Search
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:53:20 PM
Creation date
11/4/2015 2:32:00 PM
Metadata
Fields
Template:
Contract
Date
10/29/2015
Contract Starting Date
10/29/2015
Contract Ending Date
2/28/2016
Contract Document Type
Agreement - Construction
Amount
$201,103.00
Document Relationships
R 2015-584-E AMS - Harris Bros. Electric & Controls, Inc. to install standby generators at Whitted and Seymour
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 989208A2-AC78-4885-B25B-F162607F73BE <br /> Combustion air flow <br /> Exhaust gas temperature at manifold outlet <br /> Fuel consumption at 25%, 50%, 75% and 100% rated output, for both prime and standby ratings <br /> Emissions data for 100% rated output <br /> Location of nearest manufacturer's agent for service and maintenance <br /> The following data relating to the generator shall be submitted with the proposal: <br /> 1. Manufacturer, prime and standby ratings, and catalog number or series number <br /> 2. Outline drawing showing physical dimensions <br /> 3. Radiated heat <br /> 4. Waveform deviation factor and telephone influence factor <br /> The following data relating to the transfer switch, line breaker, and generator breaker shall be <br /> submitted with the proposal: <br /> 1. Manufacturer, rating, and catalog number or series number <br /> 2. Outline drawing showing physical dimensions <br /> 3. Control descriptive data and schematic diagram <br /> The following data relating to the weatherproof housing shall be submitted with the proposal: <br /> 1. Manufacturer, size, and catalog number or series number <br /> 2. Outline drawing showing physical dimensions <br />
The URL can be used to link to this page
Your browser does not support the video tag.