Browse
Search
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:53:20 PM
Creation date
11/4/2015 2:32:00 PM
Metadata
Fields
Template:
Contract
Date
10/29/2015
Contract Starting Date
10/29/2015
Contract Ending Date
2/28/2016
Contract Document Type
Agreement - Construction
Amount
$201,103.00
Document Relationships
R 2015-584-E AMS - Harris Bros. Electric & Controls, Inc. to install standby generators at Whitted and Seymour
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 989208A2-AC78-4885-B25B-F162607F73BE <br /> exploded views specific to this model must be included <br /> GENERATORS MUST BE CAPABLE RUNNING ON <br /> 58 BIODIESEL <br /> All equipment must be new, and unused and UL listed .� <br /> 59 where applicable <br /> The 72 Hour run time of the Tanks is based on full load of 5r e u�� <br /> 60 the generators tanks. <br /> 61 INSTALLATION, <br /> SUCCESSFUL BIDDER FOR THESE SECTIONS SHALL <br /> 62 BE RESPONSIBLE FOR THE FOLLOWING: <br /> Provide any and all necessary conduit, wiring, connectors, <br /> brackets etc for the successful installation of the each <br /> unit. Provide any and all necessary trenching, intrusions / <br /> on any external or internal walls and repair any of said <br /> 63 items. <br /> Equipment shall be placed on existing pads/surfaces, 6„I� <br /> unless existing pads/surfaces are not adequately sized. n^ <br /> If required, bidder shall provide a concrete pad as an t3 <br /> 64 extension of the existing to accommodate the generator. <br /> All fuel connections in accordance with the manufacturers <br /> 65 recommendations. <br /> All electrical connections to the building existing power <br /> supply will conform to National Electrical Code and <br /> applicable inspection authorities. Applicable transfer <br /> switch controls, electrical components and mounting <br /> 66 hardware shall be furnished by the supplier <br /> Contractor shall be responsible for any applicable permits, <br /> and shall furnish an external main disconnect if required <br /> 67 by inspections <br /> Any necessary equipment to remove generator from <br /> delivery truck and place on pad. Existing generator and <br /> transfer switches shall be placed by contractor on vehicles / <br /> 68 supplied by the County. <br /> 69 Clean worksite on a daily basis to avoid disruption <br /> Contractor shall be responsible for contacting ULOCO f <br /> 70 prior to any digging <br /> 71 Any and all work shall meet applicable codes. <br /> Proposal Data <br /> The following data relating to the engine shall be submitted with the proposal: (this can be submitted <br /> electronically to dcannell @co.orange.nc.us or by providing web site addresses. <br /> Manufacturer, prime and standby ratings, and catalog or series number <br /> Outline drawing showing physical dimensions <br /> Radiated heat (by engine) <br /> Radiator air flow <br />
The URL can be used to link to this page
Your browser does not support the video tag.