Browse
Search
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-584-E AMS - Harris Bros. Electric & Controls, Inc. - install standby generators at Whitted and Seymour
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:53:20 PM
Creation date
11/4/2015 2:32:00 PM
Metadata
Fields
Template:
Contract
Date
10/29/2015
Contract Starting Date
10/29/2015
Contract Ending Date
2/28/2016
Contract Document Type
Agreement - Construction
Amount
$201,103.00
Document Relationships
R 2015-584-E AMS - Harris Bros. Electric & Controls, Inc. to install standby generators at Whitted and Seymour
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 989208A2-AC78-4885-B25B-F162607F73BE ry n <br /> Harris Bros. Electric & Controls, Inc. <br /> 2712 Hillsborough Road <br /> Durham, NC 27705 <br /> Phone: (919) 220-8500 ** Fax: (919) 220-7009 <br /> BID PROPOSAL <br /> Date: September 29, 2015 <br /> To: David Cannell <br /> Company: Orange County Financial Services - Purchasing <br /> Telephone: (919) 245-2651 <br /> Fax: (919) 636-4913 <br /> Email: dcanneIl@co.orange.nc.us <br /> From: Calvin Harris <br /> Company: Harris Bros. Electric & Controls, Inc. <br /> Telephone: (919) 220-8500 <br /> Fax: (919) 220-7009 <br /> Email: cahrtnrharrisOrnsn.com <br /> Project: Orange County-Whitted Building <br /> Scope of Work: <br /> Install 2 (two) 250kw generators: <br /> 1 Whitted Building <br /> 1 Seymour Building <br /> Design Build <br /> Total Base Bid for Whitted Building: $102,435.00 <br /> Total Base Bid for Seymour Building: $79,645.00 <br /> Alternate 1: <br /> Add to Base Bid if a fuel tank to run 72 hours per Note 60 is needed and not Note 16. This <br /> price has both Gen Sets included. <br /> Total Alternate 1: $9,332.00 (Add to Base Bid) <br /> Notes: <br /> • This bid does not include up-sizing the feeders from the ATS to the 2nd floor area on <br /> either of the ATS switches. <br /> • This bid does not include extending the generator concrete pad for the Seymour <br /> Building. <br /> • This price does not include a private locator;just 811 call. <br /> • This bid includes only one run of 500kcmii at the Seymour Building, which is good for <br /> 400A even though the ATS is rated at 800A. <br /> • A disconnect is required on the exterior of each building per the local inspectors in <br /> Hillsborough and in Chapel Hill. <br /> • Priced 500 gallon tank to provide 24 hour continuous run per Note 16 and not 72 hours <br /> per Note 60. Both are listed in Notes. <br /> • Work to be done during normal working hours. <br /> • Bid good for 30 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.