Browse
Search
Agenda - 11-05-2015 - 6-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 11-05-2015 - Regular Mtg.
>
Agenda - 11-05-2015 - 6-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 9:35:21 AM
Creation date
10/30/2015 9:13:46 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 11-05-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 1 Todd LoFrese said there are significant school needs throughout the County, which he <br /> 2 and Pam Jones would be presenting. <br /> 3 Pam Jones and Todd LoFrese presented the following PowerPoint slides: <br /> 4 <br /> 5 Facilities Needs Presentation <br /> 6 September 29, 2015 <br /> 7 Pam Jones and Todd LoFrese <br /> 8 <br /> 9 Todd LoFrese presented this slide: <br /> 10 <br /> 11 Our Goal <br /> 12 • Two Districts <br /> 13 • Two Similar, but Different Set of Needs <br /> 14 • Two Different Approaches <br /> 15 • One Goal <br /> 16 — To Provide: Safe, Secure, and Healthy Facilities to Support Student Learning and <br /> 17 Achievement <br /> 18 <br /> 19 Pam Jones presented the following slides: <br /> 20 <br /> 21 Thorough, Detailed, Responsible <br /> 22 • Process started in 2011 <br /> 23 • Professional Architectural and Engineering Evaluation <br /> 24 • Comprehensive recommendations, linked to Orange County School Construction <br /> 25 Standards <br /> 26 • Scaled back: <br /> 27 — CHCCS original $200 million, now$160 million <br /> 28 — OCS original $161 million, now $65 million* (Board of Education Prioritized $50- <br /> 29 $70 million only) <br /> 30 <br /> 31 OCS Facilities Summary <br /> 32 Focus on projects not fundable through current Capital Investment Plan (CIP) allocations <br /> 33 in these areas: <br /> 34 — Safety <br /> 35 — Replacement of antiquated mechanical equipment <br /> 36 — Cedar Ridge classroom wing <br /> 37 — Replacement of Transportation facilities <br /> 38 — Upgrade/Replace food service facilities/equipment <br /> 39 <br /> 40 Areas of Work <br /> 41 • Estimated total: $15.9 million <br /> 42 • Major Mechanical System Replacement <br /> 43 — A.L. Stanback Middle <br /> 44 — Cameron Park Elementary <br /> 45 — Central Elementary <br /> 46 — Efland Cheeks Elementary <br /> 47 — Grady Brown Elementary <br /> 48 — Hillsborough Elementary <br /> 49 — Orange High School <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.