Browse
Search
Agenda - 11-05-2015 - 5-d - Zoning Atlas Amendment Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Harts Mill - Closure of PH and Action (No Additional Comments Accepted)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 11-05-2015 - Regular Mtg.
>
Agenda - 11-05-2015 - 5-d - Zoning Atlas Amendment Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Harts Mill - Closure of PH and Action (No Additional Comments Accepted)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 9:56:19 AM
Creation date
10/30/2015 9:05:03 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5d
Document Relationships
2015-593 SOC of Proposed Zoning Atlas Amendment to rezone property allowing for development of a village style residential community
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 11-05-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
ORD-2015-030 Ordinance Amending the Orange County Zoning Atlas
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 <br /> i. Farm operations (i.e. animal husbandry, forestry activities, crop <br /> production, processing, etc.) <br /> ii. Accessory farm structures including, but not limited to: <br /> a. A maximum of 4 houses <br /> b. A maximum of 4 garages/barns for farm equipment/vehicle <br /> maintenance and storage, farm product processing and <br /> storage, etc. <br /> c. Woodworking shop <br /> d. Produce processing center (washing/packing area) <br /> e. Pottery studio with kiln. <br /> iii. Single-family and two-family (i.e. duplex) residential units. <br /> iv. Community House, limited to a total square footage of 6,000 sq. ft., <br /> with common facilities including, but not limited to: laundry facilities, <br /> mail room, activity room, and community kitchen. <br /> v. Administrative office including meeting facilities for local residents. <br /> vi. Accessory uses including: <br /> a. Customary accessory uses for individual residential units <br /> b. Maximum of 2 art/hobby studios for use by local residents <br /> not to exceed a total square footage of 1,000 sq. ft. per <br /> building <br /> c. Minor home occupations shall be allowed for each <br /> residential dwelling unit. Such uses shall be reviewed and <br /> acted upon in accordance with the UDO <br /> d. Parking area/garages <br /> e. Electric car/golf cart charging stations. <br /> vii. Solar Array — Large Facility to be reviewed and acted upon in <br /> accordance with the provisions of Section(s) 2.7 and 5.9.6 of the <br /> UDO. <br /> viii. Recreational land uses — recreation uses for local residents shall be <br /> allowed including: <br /> a. Walking trails/paths <br /> b. Multi-purpose athletic fields, as shown on the approved site <br /> plan, supporting such activities. No infrastructure (i.e. <br /> outdoor field lights, buildings, etc.) shall be permitted <br /> c. Individual recreational uses for residences treated as <br /> customary accessory land uses. <br /> c.Setbacks: <br /> i. No residential structure shall be located within 100 ft. of the <br /> perimeter of the property line. <br /> ii. No farm structure housing animals shall be located within 40 ft. of <br /> the perimeter property line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.