Orange County NC Website
33 <br /> Michael Harvey <br /> Fnmnn: Alan Clapp <br /> Sent: Wednesday,August 05' 20l55:22PK4 <br /> To: Michael Harvey <br /> Cc: John Kase; David Ward;John R. Davis <br /> Subject: RE: Response from Harts Mill on water line and wastewater disposal concerns <br /> Michael, <br /> We are fine if they want to pursue either large system or a cluster ofsmaller systems. <br /> The criteria for a large subsurface septic system (Design flow > 3000gpd) is <br /> linked. http:llehs.nc ublichealth.comloswpldocs/indILargeS bsurfaceProcedures-2013 |f they wish to <br /> pursue a large surface discharge system then NCDENR Division of Water Resources will be the permitting agency. Their <br /> requirements are located at: . <br /> Typically large system has to have all components completely installed before the system can be placed into <br /> operation. The advantage to specific use or cluster systems is that you can build as you go. NCDENR Division of Water <br /> Resources does not require repair area for their systems. NC DHHS systems via the local health department do require <br /> repair area. <br /> We will evaluate the soil/site conditions if they choose to go the subsurface system route. <br /> Alan <br /> Alan Clapp <br /> Environmental Health Director <br /> Phone: 919.Z4S.Z360/ Fax: 919.644.3006 <br /> VVebsite: <br /> Email: <br /> mcIzwosJ ncwr <br /> �mpmovingheo;th. �n.sp�ringcbmoge <br /> ��� ������| V�0/ All <br /> �� <br /> ��� �� v <br /> Please tell us how we are doing by taking this very quick survey. We appreciate your comments. <br /> From: Michael Harvey <br /> Sent: Tuesday, August O4, 2O158:]1AM <br /> To: Craig Benedict; Howard W. Fleming; Kevin Murphy ; ]ameSGroveS; ]aSon Shepherd; <br /> Alan Clapp; Deputy Chief Pete Hallenbeck <br /> Cm: ]ohn Roberts; ]ames Bryan; Anne Marie Tosco <br /> Subject: Response from Harts Mill on water line and wastewater disposal concerns <br /> 1 <br />