Browse
Search
2015-565-E AMS - Concrete Alterations for grinding/sealing concrete floors at 113 Mayo St., DSS expansion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-565-E AMS - Concrete Alterations for grinding/sealing concrete floors at 113 Mayo St., DSS expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 4:34:03 PM
Creation date
10/27/2015 4:25:39 PM
Metadata
Fields
Template:
BOCC
Date
10/27/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$14,250.00
Document Relationships
R 2015-565-E AMS - Concrete Alterations for grinding and sealing concrete floors at 113 Mayo St., DSS expansion
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 36E6A8AF-COF9-489A-B278-380FB6C91329 <br /> [Departmental Use Only] <br /> TITLE DSS Exp Concrete Grind/Seal <br /> FY 2016 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"), made as of the 9th day <br /> of October, 2015, by and between Concrete Alterations., (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Corley Redfoot Architects (Sheet N/A dated N/A) <br /> b. Written specifications prepared by the project engineer. <br /> c. Concrete floor grinding and sealing proposal dated October 9, 2015 which fully describes <br /> the work to be performed, such work(hereinafter called the "Work"). <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> Revised 10/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.