Browse
Search
Agenda - 12-11-2007-4s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:35:41 PM
Creation date
8/28/2008 10:42:29 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4s
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as <br />Exhibit F <br />Construction Cost Detail <br />Area "C" -Glen Ridge Town Home Association, Inc. property segment of sewer facilities <br />Total of itemized construction elements $156,732 <br />Pro rata share of mobilization/demobilization 5,000 <br />Total <br />$161,732 <br />Included in the Total are allowances for 250 cubic yards of rock removal at a price of $35.00 per <br />cubic yard and 250 cubic yards of unsuitable soil removal and replacement at a cost of $25.00 <br />per cubic yard. The cost to be shared by M/I, Priority and the County shall be increased or <br />decreased to the extent that the rock and the unsuitable soils quantity allowances are exceeded or <br />not reached. <br />Area "B" - M/I property segment of sewer facilities <br />Total of itemized construction elements $ 56,159 <br />Pro rata share of mobilization/demobilization 2,040 <br />Total <br />$ 58,199 <br />Included in the Total are allowances for 100 cubic yards of rock removal at a price of $35.00 per <br />cubic yard and 100 cubic yards of unsuitable soil removal and replacement at a cost of $25.00 <br />per cubic yard. The cost to be shared by MII, Priority and the County shall be increased or <br />decreased to the extent that the rock and the unsuitable soils quantity allowances are exceeded or <br />not reached. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.