Browse
Search
Agenda - 12-11-2007-4s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:35:41 PM
Creation date
8/28/2008 10:42:29 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4s
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is <br />b. M/I and the County will share equally the total cost of the construction of <br />the sewer facilities across the M/I properry, Area "B" on Exhibit F hereto, which total cost is <br />particularly detailed on Exhibit F hereto. <br />6. MII and Priority each shall pay its portion of the total costs of the sewer facilities <br />construction project as detailed in paragraph 5 of this Agreement in one lump sum payment <br />within thirty (30) business days after receipt of written demand for payment from the County, <br />which demand shall be accompanied by (i) a complete copy of the as-built drawings of the sewer <br />facilities, (ii) an itemized statement of the actual costs of construction of the sewer facilities, <br />certified by the project engineer and (iii) written evidence of acceptance of the sewer facilities by <br />the Orange Water and Sewer Authority. <br />7. The County agrees, through its agent the Chapel Hili-Carrboro City Board of <br />Education, to construct the sewer facilities in accordance with the completed plans and <br />specifications approved by OWASA and all other applicable governmental entities under the <br />standards and requirements of OWASA, and shall cause OWASA to accept the sewer facilities <br />for operation and maintenance as part of the OWASA sewer system, including resolving all <br />sewer system repairs, warranty claims or any other OWASA requirement necessary to <br />accomplish OWASA acceptance of the sewer facilities at the conclusion of the sewer facility <br />construction warranty period. <br />8. In the event County does not commence construction of the sewer facilities <br />construction project at its "downstream" end (at the point where it connects to an existing <br />Orange Water and Sewer Authority sewer facility at or near the eastern boundary of the <br />Glenridge Townhome Association property) on or before January 15, 2008, any party to this <br />Agreement may, in its sole and absolute discretion, terminate this Agreement by providing notice <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.