Browse
Search
2015-552-E AMS - Dickerson Fencing & Landscaping 131 W. Margaret Ln fencing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-552-E AMS - Dickerson Fencing & Landscaping 131 W. Margaret Ln fencing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 4:00:29 PM
Creation date
10/14/2015 11:11:50 AM
Metadata
Fields
Template:
Contract
Date
10/13/2015
Contract Starting Date
10/8/2015
Contract Ending Date
11/25/2015
Contract Document Type
Contract
Amount
$2,152.00
Document Relationships
R 2015-552-E AMS - Dickerson Fencing & Landscaping for fencing at 131 W. Margaret Lane
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2E150770-7335-4B4E-BDA7-47D76E2FC4C6 <br /> e k i-so 1i <br /> erilchig & Landscaphig <br /> 202 N, Mxwer Road <br /> t at.m°IMIM, NC 27703-2302 APW <br /> l"'h rve 919-596-6765 <br /> Fl"I 919-598-0791 <br /> 1 <br /> Customer: Assett Management Services Phone 919-245-2658 <br /> Ad&dss: PO Box 8181 Job Name 131 W. Margaret Lane <br /> City, States,ZIP: Hillsborough, NC 27278 Job 166ale Hillsborough, NC <br /> AttenbohlGordan Dively Ema l- adivelyCa)oranciecountync.ciov <br /> Date: 9/21/2015 Revised 9/25/2015 <br /> Furnish materials and labor to replace (5) 42" x 6' wide black ornamental steel fence panels <br /> with rings and install (6) 4" black bollards post filled with concrete. <br /> Total: $ 2,152.00 <br /> NOTE: We will call underground utility line locator. Locator does not locate these lines: water, sewer, satellite or private <br /> power lines. We will not be responsible for repair cost of any personal line that may be cut during digging of post holes. <br /> Upon acceptance, please sign the proposal and return to our office. A return envelope <br /> is enclosed for your convenience. <br /> We Propose hereby to furnish material and labor-complete in accordance with above specifications,for the sum of: <br /> Two thousand one hundred fifty two dollars and 00/100...................... $2,152.00 <br /> Payment to be made as follows: <br /> 1/3 down payment of$ 717.00 is due before beginning the work and the balance of$ 1,435.00 is due upon <br /> completion of the job. Please provide a signed proposal with payment. <br /> All material is guaranteed to be.as specified.All waxk to be.completed in a <br /> orkmanhke rnanner a cording to standard business practices. Any Authorized <br /> alteration or deviation above specifications involving extra costs will be <br /> e cutzd only upon written orders,and—ill an extra.charge over <br /> ana ab—v the'P"a te.All agree nents�ontingea=upon st ikes,accidents, Signature: William Dickerson, Ill <br /> or delays beyond o ontrol.C>--r to c my fire,tornado,and other <br /> essary insurance..Our workers are fully covered by Workman's <br /> Compensation Insurance. <br /> This proposal is good for 30 days. <br /> Acceptance of Proposal Signature <br /> The above prices,specifications and conditions are satisfactory and are hereby accepted. Signature <br /> You are authorized to do the work as specified.Payment will be made as outlined above: Accepted Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.