Orange County NC Website
STRATEGIC GROWTH AND RURAL CONSERVATION PROGRAM <br />Draft ~ 10.1.2007 a~ <br />Table 2-7. Residential Planning Flow Process (Continued) <br /> <br />-. - <br />6. Initiate the Application Submittal <br />p. Pay Application Fee(s) <br />q. Internal Staff Review <br />i. Approve <br />ii. Disa rove with Comments <br />7. Concept Plan Development In the concept plan for projects <br />On-Site Visit with O.C. Staff <br />r proposing to use SGRC, it would be <br />. <br />s. Sketch Plan (conventional or flexible) wise to have a qualitative notation <br />identifying any resources, utilities, <br />t. Lot Layouts (not necessarily surveyed) roadways, or school capacities <br />u. Location of Notable Features that would be negatively affected <br />v. Negotiate with Rural Conservation Area Participant(s) should the SGRC option be <br /> ursued. <br />8. Neighborhood Informational Meeting During this meeting, there is an <br />w. Mailings (Address List from Developers) Sent to opportunity to explain both the <br />People within 500' Buffer Around Project CUP and SGRC process /program <br />and how they benefit Orange <br />x. Drop-In Style Meeting Format Co un <br />9. Concept Plan Review Note that no conditional use <br />y. O.C.-Staff Only requirement will be LESS restrictive <br />z. Same Review Group as Preliminary Plan Review Phan any overlay district <br />requirement already in place. <br />aa. Offer Comments to Developer A CUP essentially requires a <br />bb. Note CUP Conditions for Approval rezoning to a Conditional Use <br /> District. <br />10. Planning Board Review of Concept Plan The CUP process would allow <br />cc. Staff) Developer Presentations public boards to attach additional <br />dd. Public Comments conditions on approval, especially <br />design and mitigation measures to <br />ee. Review Concept Plan offset negative impacts due to <br />i. Approve more intensive uses. <br />ii. Disapprove (One-Year Moratorium) <br />iii. Disa rove with Corrective Actions <br />11. Preliminary Plat Development The SGRC property valuation <br />Roads /Driveway Permit <br />ff assessment would be presented at <br />. <br />gg. Erosion Control Review this time, should the Rural <br />Conservation Area landowner and <br />hh. Environmental Health Review developermutuallyogree that one <br />ii. Fire Su ression Plan <br />pp is necessary. At this time, the <br />jj. Solid Waste Review developer could pursue a <br />kk. Lot Surveys Completed Development Agreement with the <br />II. Binding Option Signed with R.C.A. Landowner Covnty as an alternative to the <br />mm. Easement Language and R.C.A. Strategic traditional approval process. <br />Growth Area Shown on Ma <br />12. Preliminary Plat Review <br />nn. O.C. Staff Only <br />oo. Conduct R.C.A. Review (if initial review older than <br />two years) <br />pp. Letter to Developer for Comment (if significant <br />comments) <br />. Review Si ned Bindin O tian A reement <br />Orange County, North Cazolina <br />