Browse
Search
Agenda - 12-11-2007-4q
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4q
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:37:52 PM
Creation date
8/28/2008 10:41:43 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4q
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRATEGIC GROWTH AND RURAL CONSERVATION PROGRAM <br />Draft j 10.1.20071 --- <br />Design Requirements. Desigri requirements will be incorporated into eventual SGRC <br />ordinance provisions based on the County's design guidelines developed for the <br />Efland-Mebane area. These will apply to all Growth Area properties participating in the <br />SGRC Program and will serve to ensure that the increased development intensity does <br />not negatively impact nearby land values or quality of life. <br />2.3 SGRC Administrative Design <br />In addition to the considerations of how. the SGRC Program will be operated from the <br />perspective of the users (participants) of the program, the project team .also <br />considered how SGRC would operate internally. The following two sections illustrate a <br />process workflow for both residential and. commercial properties, highlighting areas that <br />would be applicable only to proposed projects using SGRC conservation credits. First, it <br />is useful to understand how residential and commercial planning review processes <br />operate in Orange County novv, described briefly in the following section. <br />2.3:1 Existing Planning Process <br />After the initial contact with the Orange County Planning & Zoning Department staff <br />("staff"), the developer prepares a description of the location of the site, which staff <br />then reviews to determine if the site is within a managed area (e.g., critical watershed), <br />the suitability of the soils for in-ground septic treatment, and if the proposed use "fits" <br />the existing zoning code. This is a followed by a Preapplication Meeting, which <br />describes the site in more detail, notably determining the "yield" or number of <br />residential units (or commercial square feet of floor area) that the proposed <br />development site could contain. Different requirements will be placed on the <br />developer depending if the proposed residential subdivision is a minor, major, Special <br />Use, or Planned Development application, which in turn depends on the number of <br />units .being proposed and if the site is located in an urban or rural area. If the <br />subsequent Application Fee and Application are furnished, then the staff must review <br />the application and approve or disapprove with comments. Once approved, the <br />developer then prepares a conceptual site plan, noting important features of 'and near <br />the site, but not necessarily having all lot lines surveyed. This concept plan is then <br />reviewed at a Neighborhood Meeting, adrop-in style meeting of nearby residents that <br />are notified of the proposal and meeting opportunity by staff. The Planning Board then <br />gets to.review the (modified, if needed) concept plan, and can approve, disapprove, <br />or disapprove unless corrective actions are taken by the developer. Once the concept <br />plan has gained approval, the developer then must prepare a preliminary plat <br />(surveyed), present the proposal again at a Planning Board meeting, at a quarterly <br />public hearing (if the proposal has 20 or more residential units), and then obtain <br />approval from the Orange .County Board of Commissioners. The Final Plan is <br />subsequently submitted, recorded, and fees submitted by the developer. <br />Commercial developments typically undergo a slightly less lengthy process, notably <br />omitting the Neighborhood Meeting requirements, but are still required to be presented <br />at a quarterly public hearing for official comments. Commercial sites using the <br />Economic Development District (EDD) designation would also be required to adhere to <br />the EDD Design Manual specifications, which may be somewhat more costly and time <br />consuming to meet. <br />Orange County, North Cazolina <br />
The URL can be used to link to this page
Your browser does not support the video tag.