Browse
Search
Agenda - 12-11-2007-4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:38:10 PM
Creation date
8/28/2008 10:41:35 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4p
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />__ <br />INSTRUCTIONS FOR COMPLETING PETITION: <br />1. Complete Information Section <br />2. Identify Contact Person (This person serves as spokesperson for petitioner(s)). <br />3. Attach four (4) copies of recorded subdivision plat or property deeds, which refer to candidate road. <br />4. Adjoining property owners and/or the developer may submit a petition. Subdivision roads with prior <br />NCDOT review and. approval only require the developer's signature. <br />5. If submitted by the developer, encroachment agreements from all utilities located within the right of <br />way shall be submitted with the petition for Raad addition. However, construction plans may not be <br />required at this time. <br />6. Submit to District Engineer's Office. See http'//www doh dot.state.nc.us/operations/divisionl3/default.html for <br />county and district locations. <br />FOR NCDOT USE ONLY: Please check the appropriate block <br />^ Rural Road ^ Subdivision platted priarto October 1, 1975 ^ Subdivision platted after October 1, 1975 <br />REQUIREMENTS FOR ADDITION <br />If this road meets the requirements necessary for addition, we agree to grant the Department <br />of Transportation aright-of-way of the necessary width to construct the road to the minimum <br />construction standards of the NCDOT. The right-of-way will extend the entire length of the <br />road that is requested to be added to the state maintained system and will include the <br />necessary areas outside of the right-or-way for cut and fill slopes and drainage. Also, we <br />agree to dedicate additional right-of-way at intersections for sight distance and design <br />purposes and execute said right-of-way agreement forms that will be submitted to us by <br />representatives of the NCDOT. The right-of-way shall be cleared at no expense to the <br />NCDOT, which includes the removal of utilities, fences, other obstructions, etc. <br />General Statute 136-102.6 (see page 29 for Statute) states that any subdivision recorded on or <br />after October 1, 1975, must be built in accordance with NCDOT standards in order to be <br />eligible for addition to the State Road System. <br />Form SR-1 (1/2001) <br />
The URL can be used to link to this page
Your browser does not support the video tag.