Browse
Search
2015-546-E AMS - Mechanical Solutions INC. - preventative maintenance service water system at Animal Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-546-E AMS - Mechanical Solutions INC. - preventative maintenance service water system at Animal Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 4:35:48 PM
Creation date
10/8/2015 9:09:09 AM
Metadata
Fields
Template:
BOCC
Date
10/7/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$1,450.00
Document Relationships
R 2015-546-E AMS - Mechanical Solutions INC. for preventative maintenance service for the water system at Animal Services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: CCB5CCD8-1AB9-4C00-B1 F6-A07CF92FB7AD <br /> Mechanical Solutions , Inc . <br /> Page 2 <br /> B. Quarterly Service <br /> 1 Test system water feed for Ph,TDS, hardness, iron and SDI (Silt Density Index) <br /> 2 Visually inspect operating system for damage and leaks. Verify proper <br /> operation of all mechanical components, make necessary adjustments or <br /> minor repairs <br /> 3 Inspect chlorine injection pump system for any operational issues.Clean <br /> delrin seats,check ball and injector. <br /> 4 Test site chlorine levels at end use levels. Make any necessary adjustments to <br /> chlorine injection system <br /> 5 Inspect Micro Z filter operation, manually test backwash cycles and check <br /> timer. <br /> 6 Test system water feed for Ph,TDS, hardness,iron and SDI (Silt Density Index) <br /> and Chlorine post Micro Z filter <br /> 7 Replace(7) post filter cartridges 5um-30in <br /> 8 Inspect Siemens ultraviolet light confirm all bulbs are burning and record <br /> hours of operation <br /> 9 Sample water for Nationwide Colony Count test at point of use. <br /> 10 Provide written report of quarterly services performed and results of testing <br /> to facilities manager, Report issues to facilities manager <br /> C. Semi-Annual Service <br /> 1 Provide(1)replacement 14.5 gallon Tote chlorine <br /> D. Annual Service <br /> 1 Replace(6) UV lamps <br /> 2 Replace(6) UV quartz jackets <br /> 3 Replace(12) UV o-rings <br /> 4 Provide (1)bottle Chlorine test strips for on-site monitoring and log records <br /> 5 Replace post filter oring <br /> Services,including parts and labor are to be provided at an annual cost of$2900.00 plus <br /> applicable taxes. <br /> Billed Quarterly at$725.00 payment is expected net 30 days of invoice date. <br /> Website: WWW.THEWATERGURU.COM • <br />
The URL can be used to link to this page
Your browser does not support the video tag.