b) The documentary evidence shall consist of a certified statement by the CoMraetor <br />and by each of the Contractor's Subcontractors ind'lviduaily. showing total <br />purchases of materials from each separate vendor and totai sales and use taxes <br />paid to each vendor. Certified statements must show the invoice number, or• <br />numbers, covered, and inclusive dates of such invoices. <br />c) Materials used from Contractor's ar Subcontractor's warehouse stock shall be <br />shown in a certified statement at warehouse stock prices. <br />d} The Contractor shalt not be required to certify the Subcontractor's statements. <br />ARTICLE 30. OPERATION OF OWNER'S FACILITIES <br />30.1 The Contractor agrees that all Work done under the Contract Documents shad be carried <br />on in such a manner so as to ensure the regular and continuous operation of the adjoining <br />or adjacent fadlities. The Contractor further agrees that the sequence of operations under <br />the Contract Documents shall be scheduled and carried out so as to ensure said regular <br />and continuous aperat'soh. The Contractor shah not dose any areas of construction untl so <br />-authorized by the CMAR. The Contractor shaii control operations to assure the least <br />inconvenience to the public. Under aii circumstances, safety shall be the most important <br />consideration. <br />ARTICLE 31. TI-t1RD PARTY BENEFICIARY Gt.AUSE <br />31.1 it is specifically agreed between the parties execu#ing the Agreement that, with the specific <br />exception set forth paragraph 7.24 of these General Conditions, and that exception only, <br />the Contract Documents and the prov'ssions therein are not intended to make the public, or <br />- --any member thereof, athird-party beneficiary of the Agreement, ar to authorize anyone not <br />a party to the Contract Documents to maintafi a suit for personal injuries or property <br />damage pursuant to the terms of pravis'sons of the Contract Documents. <br />ARTICLE 32. MEASUREMENT OF QUANTITIES <br />32.1 Ait Work completed under the Contract Documents shall be measured by the Contractor <br />using United States customary units of measurement. The method of measurement and <br />computations to be used in determination of quantities of material fumished• and of Work <br />performed under the Contract Documents shall be those methods set forth in the Contract <br />Documents or, if not specifically set forth therein, the method generally recognized as <br />conforming to good engineering practice. <br />ARTICLE 33. TERMINATION t3Y THE CMAR FOR CAUSE <br />33.1 if the Contractor faits to begin ar complete the Wark under the Contract Documents within <br />the time specified, or faits to perform the Work with sufficient labor and equipment or with <br />sufficient materials to insure the prompt completion of said bVork, ar shalt perform the Work <br />unsuitably or shaii discontinue the prosecution of the Work for three (3) consecutive days, <br />ar if the Contractor shaii become insolvent, be declared bankrupt, commit any act of <br />bankruptcy or insolvency, allow any finat judgment to stand against the Contractor or 'sts <br />affiliated companies unsatisfied for a period of forty-eight {48) hours, make an assignment <br />for the benefit of creditors, ar for any other cause whatsoever shalt not carry on the Work in <br />an acceptable manner, the. CMAR may give notice in writing to the Contractor and the <br />Contractor's sureties of such delay, neglect, or default, specifying the same, and if the <br />Contractor within a period of three (3} days after such notice shaii not proceed in good faith <br />and with reasonable speed to correct such delay, neglect, or default in accordance with <br />such native, the CMAR shall have full power and authority, to the extent permitted by law, <br />without violating the Contract Documents, to take the prosecution of the Work out of the <br />GENERAt_ GONDlTiONS FOR CM AT RISK PROJECT 4D of 42 , ,TUNE ZDD7 EDiTi4N <br />