shown at that time to be incomplete or detective. Within thirty {30} days of receipt of any <br />deficiency list, the Contractor shall complete and correct a!I items on That list a€ong with alt <br />other Work required to achieve Finial Completion of the Work, At any time prior to <br />completion of the period of warranty, the CMAR may submit to the Contractor suppiementat <br />deficiency fist's, in which case the Contractor shall complete or correct any and all new <br />items identified on the supplemental deficiency fists within the time period stipulated in <br />paragraph 18.3 of these General Conditions. <br />21.3 The making and acceptance of Final Payment shalt constitute a waiver of alt claims by the <br />CMAR except: <br />a} Claims arising from unsettled liens or claims against the Contractor. <br />b} Defective Work or materials appearing after Ftna1 Payment. <br />c} Failure of the Contractor to perform the Work in accordance with the Contract <br />Documents. <br />d) As conditioned in the Performance l3ond. <br />e} Claims made prior to Final Payment which remain unsettled. <br />f) Amounks due arising under Articles 18 and 28 of these General Gonditions. <br />g} Claims for recovery of overpayment based upon incorrect "rr-easurement, estimate, <br />or certificate. <br />2i.~t The making and acceptance of Ffnal Payment shah constitute a waiver of all claims by the <br />Contractor except those claims previously made in writing pursuant to paragraph 15.2 of <br />these General Conditions and not finally resolved. <br />21.5 The CMAR shalt not be required to make Final Payment unless and unlit (i} the Designer <br />has certifed based an the Designer's observations and information' that all of the Wark by <br />the Contractor under the Gan#ract Documents has been completed in accordance with the <br />Contract Documents, and (ii) the Work by the Contractor has been approved by alt federal, <br />state and total agencies having jurisdiction. <br />21.6. The final Request.for Payment shall be identified on its face as such and shat[ be <br />presented by the Contractor to the CMAR within thirty (30).days of completion of the Work. <br />Final payment of the retained amount due the Contractor. shalt be made by the CMAR <br />within thirty (30} days after the later of (i) full and Final Completion of a1! Work required of <br />the Contractor by the Contract Documents, and certification of such Work In accordance <br />with paragraph 21.5; (ii} submission of the affidavits and other documentation required by <br />Article 22; {Iii} submission by the Contractor of a Request for Payment identified an its face <br />as final. <br />AI~TtCLE 22. CONTRACTOR, SUBCONTRACTOR AND St.tPPLIER AF>~IDAVfT <br />22.1 The Final Payment due the Contractor on account of the Contract Documents shall not <br />become due until the Contractor has furnished to the CMAR: (A} an affidavit by the <br />Contractor signed, sworn, and notarized to the effect that all payments for materials, <br />services, ar for any other reason in cannecttan with the Work or performance of the <br />Contract Documents have been satisfied and that no claims or liens exist against the <br />Contractor in connection with the same; {B} aff<davitsfrom each Subcontractor and supplier <br />signed, sworn, and notarized to the effect that ('t} each such Subcontractor or supplier has <br />been paid in toil by the Contractor for alt W ork performed and/or materials suppl€ed by €t in <br />GENERAL COPlDiTlONS FOR CM AT RISK PROJECT 37 of 42 JUNE 2Q07 ED1TtON <br />