13.1 ti The Contractor specifically recognizes that a delay by the Contractor in achieving any <br />Completion Date can have the effect ofi delaying fhe Substantial Completion of the Project, <br />or could force the CMAR to acceierafe the Contractor's Work or the work of other <br />contractors. Such delay in achieving a Completion Date will necessarily cause. damages, <br />losses, and expenses fa the CMAR, including, but not limited to and by way of illustration <br />" only, liquidated damages payable to the Owner, damages payable to other contractors, <br />increased and extended Project overhead, increased fees, increased costs of construction, <br />. increased and extended operation costs of other facilities, and inefficiency and loss of <br />productivity. Such damages, lasses, and expenses may be recovered #ram the Contractor <br />and, if the Contractor is bonded, its surety. <br />93.17 The sum for liquidated damages payable to the Owner is the amount stipulated in the <br />CMAR Contract and reasonably estimated in advance to cover the losses to be incurred by <br />the Owner by reason of failure of said CMAR and the Contractor(s) to complete the Project <br />within the time specified In the Construction Management Contract, such time being in the <br />essence of this Agreemenf and a material consideration thereof. <br />ARTfGt_E 14. CHANGES {N THE WORK <br />94.1 Without invalidating the Contract Documents, the CMAR mayT at any time, or from time to <br />time order additions, deletions, or revisions In .the Work. Said additions, deletions, or <br />revisions shall be authorized only by written Change Orders, Construction Change <br />Directives or Field Orders. Upon receipt of a Change Order, Construction Change Directive <br />oc Field Orders the Contractor shall .proceed with the Work involved. Ail such Work shall be <br />executed under the applicable conditions of the Contract Documents. if any change causes <br />an increase or decrease in the Contract Price andfor an extension or shortening of the <br />Contract T'sme, adjustments shall be made as provided in Article 14 andfor Article 15 of <br />these General Conditions. <br />14.2 If possible, Work shall not begin on any change or alterafion to the Work until a .written <br />Change Order is executed settling any change in the Contract Price or Contract Time. In <br />the event the Contractor and the CMAR cannot agree that an ad}"ustment to the Contract <br />Price or the Contract Time is warranted, or cannot agree on the appropriate adjustment to <br />the Contract Price or the Contract Time, in order to expedite the Work and avoid or <br />minimize delay in the Work that might affect the Contract Price or Contract Time, the <br />Contractor shall, if so directed by the CMAR in writing, nevertheless proceed with the Work, <br />and any adjusfinent to the Contract Price or Contract Tlme shall be negotiated by the <br />parties at a later date, utilizing the dispute resolution procedures under this Agreement if <br />necessary. Any claim for an adjustment in Contract Prlee or Contract Time, if not defined in <br />the Construction Change Directive, shall be promptly made in writing in accordance with <br />the procedures de~~ned in Article 15,2 of these General Conditions. <br />14.3 The Designer, through the CMAR, may authorize minor changes or alterations.in the Wark <br />not.involving change in fhe Contract Price or in the Contract Time.and not inconsistent with <br />the overall intent of the Contract Documents. These may be accomplished by a Field <br />Order. Such alterations shall not invalidate the Cantraot Documents nor release the surety. <br />if the Contractor believes that any minor change or alters#'son authorized by the Designer <br />entitles the Contractor to an increase in the Contract Price andfor an extension of Contract <br />Time, the Contractor may make a claim therefore as provided in Article 14 andfor Article 15 <br />of these General Conditions. ' <br />14.4 Except in an emergency endangering life or property, na change shall be made by the <br />Contractor except upon prior written Change Order, Construction Change Directive or Feld <br />Order authorizing such change. <br />GEtJERAL CONDlT10NS FOR CM AT RISK PRt?JECT 29 of 42 JUNE 2JC7 EDITION <br />