Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.13 The Gontractor maybe entitled to an extension of the Contract `time (but no increase fi the <br />Gantract Price) far delays arising from unforeseen causes beyond the control and without <br />the fault ar negligence of the Owner, the Designer, the CMAR, the Contractor or the <br />Con#ractor's Subcontractors as follows: <br />a) Labor disputes and strikes that directly impact the critical path activities of the <br />Master Schedule; <br />b~ Acts of Gad, tornado, Etta, hurricane, blizzard, earthquake, typhoon, or flood that <br />damage completed Work or stared materials. <br />c) Acts of the public enemy; acts of the 5tate,.Federat, or local government in their <br />sovereign capacities. <br />d) Abnormal inclement waafher as defined in Article 13.44. <br />13.14 On any day that the Contractor considers that the Project is delayed by adverse weather <br />conditions, the Gontractor shalt identify fn writing to the CMAR the adverse weather <br />conditions affecting each activity, the specific nature of the activity affected, the number of <br />hours last, and the number of and identity (by responsibility or trade) of workers affected <br />and shall obtain from the CMAf~ viritten recognittan of the delay. The time for performance <br />of this Contract includes an allowance far a number of calendar days which may not be <br />suitable for construction Wark by reason of adverse weather. Tha Contract Tirne will be <br />extended only if the Wombat of calendar days of adverse weather recognized by the CMAR <br />exceeds the number of inclement weather days set farfh below, and the Contractor <br />demonstrates how this adverse weather impacts activities on the critical path of the Master <br />Schedule. __ <br />Monfh Number of Inclement Weather Days <br />January 7 <br />February ~ 6 <br />I~larch 7 <br />Apri( 6 <br />May 7 <br />June 6 <br />July ~ 8 <br />August B <br />September - 5 <br />Uctaber ~ <br />November 5 <br />December 9 <br />13.15 if the Gontractor believes that the progress of the Work has been adversely affected by <br />adverse w_ Bather recognized by the CMAR during a particular month, the Contractor shall <br />submit a written request for extension of time to the CMAR Such a request for time <br />extension of the Contract Time shalt be submitted by the tenth (10th} day of the month <br />fottow'sng that month in which the adverse weather is encountered. The request shall <br />include, but is not limited ta, the following information: <br />a) Detailed description of wee#her's effect an scheduled activities and ifs net effect on <br />the critical path of the Project, and <br />b) Weather records from the official waafher station nearest the Project site and <br />records of actual observation as contained in daily reports, correspondence, or <br />other documentation. <br />GENERAL GOND1TlONS FOR CM AT RISK PROJECT 2$ of 42 .TUNE 2007 EDITtOi~l <br />
The URL can be used to link to this page
Your browser does not support the video tag.