Work, however, the Contractor may be required to build or set sleeves, inserts, chases or <br />other components of the Work needed far mechanical. plumtaing, electrical or other work by <br />other contractors. <br />7.33 The Ganfractor shall be responsible for permanently fixed service facilities and systems in <br />use during progress of the Work and shall strictly adhere to the following procedures: <br />a) Prior to acceptance of the Work by the Owner, the Contractor shall remove and <br />replace any part of fire permanent building systems damaged through use during <br />construction. ' <br />b) Temporary filters sha11 be installed in each of the heating and air candit~oning units, <br />return air grilles, and other locations to prevent intrusion of dust, dirE, and debris <br />during construction. Temporary filters shall be removed and replaced with new <br />filters immediately prior to Substantial Completion. <br />e) Extra effort shall be maintained to keep the 6u'siding clean and under no <br />circumstances shall air systems be operated if finishing operations are creating <br />dust in excess of whatwauld be considered nomlal if the betiding were occupied. <br />d) When the permanent fighting system is used during construction, lamps shaft be <br />replaced and shall be new an the date of Substantial Completion. <br />ARTIGL.E 8. OWNER <br />8.i ~ The Owner strait issue communications and notices to the Contractor through the CMAR to <br />the extent contemplated by the Contract Documents. ' <br />8.2 in case of termination of the employment of the Designer, the Owner shall. appoint as <br />Designer a quatifed person who shall have and assume all rights and duties held by the <br />ariginai Designer. <br />8.3 The Owner shah have the right to take possession of and use any portion of the Work <br />notwithstanding the fact that the Time far completion of such portion of the. Work may not <br />have expired, but such taking possession and use shall not be deemed an acceptance of <br />any Work not completed in accordance with the Contract Documents. <br />$.4 A waiver on the part of the Owner of any breach of any part of the Agreement by the <br />Contractor shaft not be held to be a waiver of any other or subsequent breach. <br />8.5 The Owner shall pay all permanent acreage fees, govemmentat impact fees, and meter <br />deposits far permanent utilities. <br />ARTiCi.IE 9. CONSTRUCTION MANAGER <br />9.1 The Owner has engaged the CMAR for the purpose of (i) assisting the Owner and <br />Designer In developing and administering budgets and cost controls, (ii} in evaluating <br />canstructabi[fty and value engineering proposals, (iii} in establishing and maintaining a <br />critical path method (CPM) schedule, {'sv) in coordinating andlor expediting alI Work on the <br />Project, (v). in coordinating ail Work on the Project with other projects being constructed by <br />the Owner or others adjacent to or near the Work, and (vi) for such other purposes as the <br />Owner may deem appropriate. <br />GENEf2AL CONDITIONS FOR CM AT RISK PROJECT 24 of 42 ~ JUNE 2007 EDITl4N <br />