Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor. It shall 6e necessary far the Contractor to coordinate construction activities vrith <br />such afher contractors, particularly with respect fo access to work areas, storage of <br />rnater'sals, and use of elevators and other~common facilities, The Contractor shalt diligently <br />and in good faith cooperate with fhe CMAR, the Owner, the Designer, and ail other <br />contractors with respect to such matters and shall regularly and faithfully attend any and all <br />meetings called by the CMAR with respect to such mariers. Any dlspukes between the <br />Contractor and any other separate prime contractor w[th respect to such matters shall be <br />resolved En accordance with the claim and dispute resolution procedures in the Agreement. <br />AR7'ICLI='t3. C4NTt2AC'f TIME <br />13.1 Within fourteen (14) days after initial receipt of the Construction Agreement by .the <br />Cantractar for signatures, the Contractor shall prepare and submit to the CMAR for review <br />and approval a preliminary Contractor's Construction Schedule for the Work pursuant fa the <br />requirements stated in the Contract Documents. <br />13.2 Within fourteen (14) days after inftiat receipt of the Construction Agreement by the <br />Contractor for signatures, ti'te Contractor shall submit to,the CMAR a Submittal Reglster <br />fisting alt Submittals the Contractor is required to make or proposes to make under the <br />Contract Documents, the dales on which the Contractor proposes to make such Submittals <br />and the dates by which the Contractor reasonably requires a response from the CMAR and <br />the 13eslgner with respecf to each Submittal. The dates submitted shaii be incorporated into <br />the Contractor's Construction Schedule as Completion Dates when they have been <br />approved or modified by the Owner. The CMAR and the tesigner shalt not be required to <br />review any Submittal from the Contractor until a Submittal Reglster .acceptable to and <br />approved by the CMAR has been submi#ted by the Contractor. <br />'L3.3 Nat later than thirty (30) days fiotlawing execution and delivery of the Construction <br />Agreement by the CMAR to the Contrackor, the CMAR shalt deliver to the Contractor a <br />Notice to Proceed. The Notice to Proceed shalt state a commencement date on which it is <br />expected that the Contractor wit4 begin the Work to be performed under the Agreement. <br />The Contract Tme shall be measured from said specified commencement date. The <br />commencement date stated In the Notice fo Proceed shall not be earlier than three (3) days <br />after the Notice fo Proceed is served on the Contractor. <br />lf, other than by mutual agreement, said specified commencement date is more than thirty <br />(3fl} days after the date of execution and delivery of the Agreement from the CMAR to the <br />Contractor and the Contractor be{ieves said delay justifies an increase in Contract Price <br />and/or an. extension of Contract Tirne, the Gontractor may make a claim therefore as <br />provided fn Article 14 andlor Article 15 of these General Conditions. <br />No Work shall be done prior to the date specified in the Notice to Proceed. <br />The Contraator shall submit a final Contractor's Construction Schedule for approval by the <br />CMAR no later than fourteen {74} days after issuance of the Notice to Proceed. No <br />payments shall be due the Contractor unfit this schedule fs approved by the CMAR. <br />13.4 The Master Schedule is a Contract Document. The Contractor represents that the Master <br />Schedule has been reviewed in detail and taken into account in preparing its bid. The <br />Contractor's Constnsctton Schedule shall be incorporated into the CMAR's Project Master <br />Schedule. The Contractor's Construction Schedule shaii Include alt of its activities which <br />impact, limit, or otherwise affect the time of completion of fhe Project as shown in the <br />Master Schedule. and aq of the activities of others which impact. limit, or otherwise affect <br />the start, duration, or completion of the Contractor's activities. The Contractor further <br />represents chat the Gontractor can and will complete each activity within fhe time shown for <br />GENERAL CONDITtONS FOR CM AT RISK PROJECT 26 of 42 JUNE 2007 ED1T14N <br />
The URL can be used to link to this page
Your browser does not support the video tag.