Orange County NC Website
shall pay alt bills far its consumption of water, electricity, or other public utility service to the <br />Project site. . <br />7.26 The Contractor shall indemnify and hold the GMAR, the Owner, the Designer, the <br />Designer`s consultants, and their respective officers, agents, and employees harmless <br />against all costs, damages, and expenses, including attorney's fees and costs of defense, <br />arising out of claims by any separate contractor or by any Subcontractor, sub- <br />subcontrac#or, or supplier engaged by or employed by the Contractor or employed by any <br />of the SubeaMraetors claiming through him, including without limitation damages, tosses. <br />and expenses arising out of ar relating to any inconvenience, delay, Interference, or other <br />action arnnn-action of the Contractor or the Contractor's Subcontractors on the Project. <br />The Contractor acknowledges that should the Contractor ar any of the Contractor's <br />Subcontractors be damaged by any breach of contract by any other separate contractor on <br />the Project, the. Contractor may invoke applicabte dispute resoluiian procedures with said <br />• other separate contractor. <br />7.27 Prior to completion of the Work and Final Payment of the Contract Price, excepting only <br />those portions of the Wark deemed accepted in accordance with the Contract Documents, <br />the Contractor shall have charge and care of the Work, and shall take every precaution <br />against injury or damage to any party due to the action of the elements or from any other <br />cause,' whether arising from the execution or from the non-execution of the Work. The <br />Contractor shall, as required by the GMAR, replace, rebuild, repair, restore, and make good <br />ail injury or damage to any portion of the Work occasioned by any of the above causes <br />before Final Complet'son and shah bear the expenses thereof. <br />7.28 In the event that the Work, ar any portion thereof, is suspended at any time pursuant to an <br />_.. _ '__ .order of the O4vner, the Gantractar shalt obey all instructions of the CMAR regarding <br />storage of materials, drainage, protection of the Work, and erection of temporary structures <br />during the suspension period. <br />7.29 The CMAR shall be responsible for the coordination of the Wark of the separate <br />. con#ractars, both as to space and time. The CMAR shalt incorporate the Contractor's <br />Construction Schedule Into the Master Schedule and coordinate the imptementatian of.the <br />Contractor's Construction Schedule._ The .CMAR shalt also coordinate class-out of the <br />Project, including but not limited to all testing, fispection, certincatians, and approvals <br />required by public agencies. <br />The Contractor shalt notify the CMAR promptly of any event or condition which could affect <br />the conduct or progress of the Work and shall cooperate fully with the CivtAR and all other <br />' separate contractors on the Project site. <br />7.33 The Owner has delegated to the CMAR all of its dut-es to coord'+nate and to expedite the <br />Work not expressly reserved to the Owner by other provisions of the Contract Documents. <br />7'.31 Aii Work performed pursuant to the Contract Documents shalt conform in all respects to the <br />North Carolina State Building Code and alt other state, local, and national codes in effect at <br />the time of and applicable to this Work. <br />7.32 The CMAR shall coordinate and supervise the Installatlan of all sleeves, inserts, chases or <br />other components of the. Wark needed far mechanical, plumbing, electrical or other work by <br />the various contractors. The responsibility for exact location of such items shalt be that of <br />the mechanical, plumbing, electrical or other prime contractor that requires the -terri for <br />passage or support of its work. Generally, the mechanical, plumbing, electrical or other <br />contractor that requires such Items far support ar passage of 'sts work shaA set its sleeves, <br />inserts, chases or other devices. If necessary to maintain the progress of and complete its <br />GENERAL CONDITIONS FOR CM AT RISK PRO,}ECT 23 of 42 ,lt1NE 2007 EDITIL~N <br />