Orange County NC Website
designated to remain in the vicinity of the operations and barricade alt vtalks, roads, and <br />areas as necessary to keep the public away from the construction. <br />7.17 The Contractor shaft provide cover andlor protect at{ portions of the 11Vark and provide alt <br />materials necessary to protect the Work whether performed by the Contractor or any of the <br />Subcontractors ar sub-subcontractors. Any Work damaged through the tack of proper <br />protection, or cram any other cause, shad be repaired or replaced without extra cost to the <br />CMAR or extension to the Contract Time. <br />The Contractor shaft maintain the Work during construction and until the Work is accepted. <br />This maintenance shall constitute continuous and effective effort prosecuted day by stay, <br />with adequate equipment and farces so that the Work is maintained in satisfactory <br />condition at ail times. Ali casts of maintenance shall be included in the Contract Price and <br />the Contractor will not be paid an additional amount far such effort. Should the CMAR <br />observe That the Contractor at any time has failed to maintain the Wark as provided herein, <br />the CMAR may immediately notify the Contractor af•such non-compliance. Such notification <br />shall spec'sfy a reasonable time within which the Contractor shall be required to remedy <br />such unsatisfactory maintenance condition. Should the Contractor fail to properly respond <br />to the • CMAR's notification, the CMAR may, at the Contractors expense, #ake such action <br />as if may deem appropriate to remedy the defective maintenance, including suspension of <br />the Contractor's Work or any part thereof. Any such expense incurred by the CMAR shalt <br />be deducted from monies due ar to become due the Contractor. <br />Parking lots, streets, and walks connecting to the Project area shall 'at ati times be <br />protected by the Contractor from deposits of mud, sand, stone, titter, yr debris in any form. <br />Pedestrian traffic areas around the construction limits must be maintained in a clean and <br />safe condition at atE times with required b~Cricades and covered walkways. When <br />excavation or other operations outside the Project limits is required, the Contractor.shalt, <br />immediately following that work, return the area to its original condition. <br />All catch basins and storm drain fines in the vicinity of the Project site shall be protected at <br />all times from entry of dirt, rubble and other debris. The residue From the cleaning of trucks; <br />wheelbarrows, concrete buggies, etc. must be prevented from entering the• drainage <br />system, and if cleaning is done, the residue must be contained and removed from the <br />Project site with other refuse. . <br />7.18 No burning of refuse or debris shall be allowed inside or around the Project during the <br />course of construction. • <br />7.19 The Contractor shalt provide for and maintain necessary safety measures and safety <br />programs far the protection of its employees and other persons at the Project site, and shalt <br />comply at all times with the requirements of the mast current edition of the CAGC Safety <br />and Health Manual [or the ACC Accident Prevention Manual in Construction], or the <br />equivalent requirements of the Contractor's safety program, and shah fully comply with ati <br />Federal, State, and local laws, rules, regulations. and building code requirement's sa as to <br />pcevent accidents or injuries to persons on or about the Project site. The Contractor shat( <br />ctearty mark or post signs warning aF existing hazards, and shah barricade excavations, <br />elevator shafts, stairways, floor and wail openings and similar hazards. The Contractor <br />shall protect against damage or injury resulting from falling materials, and shall maintain alt <br />protective devices and signs throughout the progress of the Wank. <br />A11 trenches, excavations, or other hazards in the vicinity of the Work shall be weft <br />barricaded, and properly lighted at night. When 11Vork requires closing of an area normally <br />used by the Owner or the public, the Contractor shall furnish, erect, and maintain temporary <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 21 of 42 JUNE 2007 EDITION <br />