Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
written reques# of the CMAR, be removed forthwith by the Contractor, Subcontractor, or <br />sub-subcontractor employ'sng such person without cost to the CMAR, and shall not be <br />employed again in any pardon of the Work without the prior written approval of the CMAR. <br />Should the Contractor fail to remove such person or persons or fad to furnish suitable and <br />sufficient personnel for the proper prosecution of the Work within three {3) days after <br />written order, the CMAR may withhold further payment by written notice unEil compliance <br />with such order. <br />7.4 If, in the opinion of the CMAR, the Designer or the Owner, any Subcontractor on the <br />Project is incompetent ar otherwise unsatisfactory, such Subcontractor shall be replaced by <br />the Contractor with no increase In the Contract Price if and when directed by the CMAR in <br />writing. <br />7.5 The Contractor shall furnish ail materials, equipment, tabor, transportation, construction <br />equipment and machinery, tools appliances, fuel, tight. heat, and a!I other facilities and <br />incidentals necessary for the execution, maintenance, initial operation, and completion of <br />the Work, other than those specifically excluded by the Gontract Documents and to be <br />furnished by the CMAR or others. When use or storage of hazardous materials or <br />equipment or methods of more than ordinary risk are necessary in accomplishing the Work, <br />the Contractor shall give the GMAR reasonable advance notice, <br />if any materials are to be furnished or installed by the GMAR ar others under the terms of <br />the Contract Documents, said materials shalt be made available to the Contractor at the <br />location{s) specified in the Contract Documents. All costs of handling, transportation from <br />the specified Location to the Project, storage, and installing of materials fumished by others <br />shalt be included in the Contract Price. The Contractor shall be responsible for any <br />demurrage, damage, loss, or other deficiencies which may occur during the Contractor's <br />handling, storage, or use of material fumished by others. The GMAR shall deduct from any <br />monies due or to become due the Contractor any cost Incurred by the CMAR in making <br />goad any such damage, loss, or deficiency. <br />Ail equipment which is proposed to be used in the Work shall be of sufficient size and in <br />such rnechanlcal condition as to meet the requirements of the Work and produce a <br />satisfactory quality of work. Equipment used on any portion of the Work shalt be such that <br />no injury to previously completed Work, adjacent property, or existing facilities shalt result <br />from its use, <br />When the methods and equipment to be used by the Contractor accomplishing the Work <br />are not prescribed in the Contract t7ocumen#s> the Gontractor shalt be free to use any <br />methods or equipment that will accomplish the Wank in conformity with the requirements of <br />the Contract Documents. <br />When the Contract Documents specify the use of certain methods and equipment, such <br />methods and equipment snail be used unless others are authorized in wrifing by the <br />CMAR. If the Contractor desires to use a method or type of equipment other than that <br />specified in the Contract Documents, the Contractor may request authority from the CMAR <br />fo da sa. The request shall be in writing and shall include a full description of the methods <br />and equipment proposed and of the reasons for desiring to make the change. if approval is <br />given. it shall be an the condition that the Contractor shalt be fully responsible far producing <br />Work in conformity with the requirements of the Contract Documents. If, after trial use of <br />the substituted methods or equipment, the CMAR or the t7eslgner determines that the Vtilark <br />produced does not mee# the requirements of the Contract Documents, the Contractor shall <br />d'sscontinue the use of the substitute method or equipment and shalt complete the <br />remaining Work with the specified methods and equipment at no additional cost to the <br />Owner_ The Contractor shall remove any deficient Work and replace it with Work of <br />GENERAL CONDITIONS FOR CM AT RISK PRt7JECT 18 af42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.