Orange County NC Website
The CMAR shall perform the Services described herein. The <br />sequence Irt which they are provided shall be as set forth in the <br />approved Construction Management Plan. <br />3.2 CMAR Personnel <br />The services to be provided by the CMAR under this <br />Agreement shall be performed by personnel identified by the <br />CMAR, and approved by the Owner; before commencing <br />services. The famishing of services by such personnet <br />throughout the duration of the Project, and any individuals <br />approved by the Owner to replace them, is of the essence to <br />this Agreement. <br />3.2.1 dditioes. Rerpovals. Replacements <br />From time to time, personnel may be added as necessary and <br />appropriate to the stage of planning, programming, designing <br />and constructing the Project. The CMAR shall anticipate the <br />need for such additional personnel by submitting to the Owner, <br />no later than seven (7) days prior to the need for the additional <br />personnel, a list of the proposed additional personnel, attaching <br />the resumes of proposed additional personnel, and stating the <br />reasons for such additions. The Owner shall promptly review <br />the proposed addttions and edher approve or disapprove the <br />additional personnel in writing. The CMAR shall not employ <br />any individual to perform the functions of any approved <br />personnel without the advance approval of the Owner, which <br />approval may be granted or withheld in its sole discretion. The <br />CMAR shall not, for so long as any approved person is <br />employed by the CMAR, remove, substitute or reduce the time <br />devoted to the Project by such person without the Owner's <br />prior written approval, which may be granted or withheld in its <br />sole discretion. ff the Owner is for any reason dissatisfied with <br />the services rendered by any approved person, the CMAR <br />shall promptly remove such person and recommend a <br />replacement. if any approved parson ceases employment with <br />the CMAR, or if the Owner requests the removal of eny such <br />person, then the CMAR shall promptly notify the Owner of a <br />proposed substitute of at least equal quaycations to perform <br />the same functions, and provide a resume for the substitute. <br />Each substitute parson must be approved by the Owner prior to <br />commencing performance of any services for the Project, which <br />approval may be granted or withheld in the Owner's sole <br />discretion. The CMAR shall bear, at its own expense and <br />without reimbursement by the Owner, alt costs associated with <br />replacing, for any reason, any approved personnel. The CMAR <br />shall remain solely responsible to the Owner, notwithstanding <br />the Owner's approval of any approved personnel, for the <br />quality and performance of alt services provided by such <br />personnel. <br />3.2.2 CMAR's Project Representative <br />The CMAR shall designate a Project Representative who has <br />the authority to ad on behalf of the CMAR in respect to all <br />matters that era the subject of this Agreement, including, <br />without limitation, the power and authority to enter Into <br />agreements ar modifications that contractually bind the CMAR. <br />The Project Representative shall be available at ail times <br />during all phases of performance of services under this <br />Agreement to consult with the Owner on matters pertinent to <br />design and construction of the Project. <br />3.2.3 CMAR's Emolovees <br />None of the persons employed by the CMAR shalt 6e <br />considered employees of the Owner. Tha CMAR shall be <br />solely responsible for any workers' compensation obligations, <br />withholding taxes, unemployment insurance, compliance with <br />immigration and licensing laws, and any other employer <br />obligations with respect to alt of their respective employees. <br />3.3 Construction Manaoement Plan <br />W(thin 3t} days after execution of this Agreement, <br />the CMAR shall present to the Owner a Construction <br />Management Plan for the Project, including dates by which <br />deliverables required by the Construction Management Pian <br />will be completed. The CMAR shall make recommendations for <br />revisions to the Construction Management Plan throughout the <br />duration of the Project, as may be appropriate. In, preparing <br />the Construction Management Plan, the CMAR shall consider <br />the Qwner's schedule, budget, and design requirements for the <br />Project. Tha CMAR shall then develop various alternatives far <br />the sequencing and management of the Project and shall make <br />recommendations to the Owner. The Conswction <br />Menagernent Plan shall also include a description of the <br />various bid packages recommended for the Prajed. 77re <br />Construction Management Plan shall be presented to the <br />Qwner for acceptance. Revisions approved by the Owner shall <br />6e incorporated into the Construction Management Plan. <br />3.4 Consuitani Selection <br />If requested by the Owner, the CMAR shall assist the Owner in <br />the selection of designers and other consultants necessary for <br />the Project (generally referred to in this Agreement as <br />"Consultants") by developing Iisis of potential firms, developing <br />criteria for selection, preparing and transmitting the requests fnr <br />5 <br />