Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor in this Agreement. The Contractor snail provide a written copy of the ciaim or <br />alleged claim to the CMAR within three {3) days of the Conttactor's receipt of the claim or <br />alleged claim. }f a ciaim is settled to the satisfaction of the ciaimant, the Contractor snail <br />• submit a copy of the ciaimani's release to the CMAR. <br />if a claim or alleged claim is rejected by the Contractor andlor its insurance company, the <br />Contractor shalt imrnediatefy report this fact to the CMAR, <br />Should thirty {30}days elapse after the claim or aleged claim has been received by the <br />Contractor, and the Contractor Cs not able to report a settlement or rejection of the claim, it <br />shall report to the CMAR the steps being taken with respect to the ciaim. <br />Without iimiting the foregoing, the Contractor shall notify the CMAR in writing of any paid or <br />incurred claims which may impair annual aggregate or genera( liability. <br />5.7.7 Deductibles and Self-insured Retentions <br />Any deductibles or self-insured retentions must be declared to and approved by the CMAR. <br />At the option of the CMAR, either: the insurer shah reduce to a max[mum of $25Q,00t} ar <br />eliminate such deductibles or self-insured retentions wtth respect to the CMAR, ar the <br />Gontractor shall provide evidence of coilaterai provided to insurers ar procure a band <br />guaranteeing payment of losses and related investigations, claim administration, and <br />defense expenses within the deductible or self-insured retention amount, Any self-insured <br />retention ar deductible amount on the policy snail not reduce the amount of eallectible limits <br />or liability. <br />5.1.13 Subcontractors <br />The Contractor shall include alt Subcontractors as Insureds under its policies, or shall <br />famish separate certificates, policies, and endorsements for each Subcontractor the <br />Contractor intends to use, if a Subcontractor does not take out insurance in its own name <br />and the Contractor wishes to provide Insurance protection for such Subcontractor and such <br />Subcontractor's empCoyees, the Contractor shalt either {a) procure appropriate poiicles in <br />the name of the Subcontractor, or (b) cause a rider ar riders to be attached to the <br />Contractor's policies which steal! identify the 5ubconiractor thereby covered; provided. <br />however, in the case of the latter option, such a rider need not be attached to the <br />Contractor's workers' compensation policy if such policy by its terms is sufficiently broad to <br />cover fhe employees of ail Subcontractors performing Wprkunder the Contract ©acuments. <br />Except as otherwise approved by the CMAR in writing, Limits of Liability and coverage <br />scope must be at a minimum as stringent as required of the Contractor by the Contract <br />Documents. ACI Work performed for the Contractor by any Subcontractor shall.be pursuant <br />to an appropriate agreement between the Gontractor and the Subcontractor which shall <br />contain provisions thaE waive ail rights the contracting parties may have against one <br />another for damages caused by fire or other perils covered by insurance as provided <br />herein. insurance monies received from any toss shaft be divided as the respective interest <br />of the parties affected shaft appear. <br />5.2 PROPERTY iNSURANCE <br />The CMAR shat) be responsible for purchasing and maintaining insurance to protect the <br />Project from penis of physical foss. 'fhe insurance shall provide for the cost of replacement <br />far the Work of the time of any foss. The insurance shall include as named insureds the <br />Owner, fhe CMAR, the Gontractors and their Subcontractors and shall insure against the <br />loss from the perils of fire and ail risk coverage for physical loss or damage due to theft, <br />vandalism, collapse, malicious mischief, transit, flood, earthquake, testing, damages <br />resulting from defective design, negligent workmanship or defective material. The CMAR <br />GENERAL. CONDITIONS FOR CM AT RISK PROJEG7 13 of 42 JUNE 2()t?7 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.