Orange County NC Website
would reasonably be made by a contractar having knowledge and experience with similar <br />work; however, the Contractor shall not be entitled to infer from CMAR-supplied information <br />any fact or condition which would not be inferred by a canfractor having knowledge and <br />experience with similar work and, ff fhe CMAR-supplied Enformation is inadequate or <br />insufficient in any respect, the Contractor shall be required to obtain independently such <br />other information as a lcnawledgeabie and experienced contractar would prudently obtain in <br />order to evaluate any such condition. <br />3.3 The Contractor specifically acknowledges familiarity with at1 Federal, State, and local laws, <br />ordinances, rules, and regulations which may in any manner affect those engaged or <br />employed In the Work, ar the materials ar equipment In or about the Work, ar in any way <br />affect the conduct of the Work and agrees that the Contractor and the Con#ractor's <br />employees, Subcontractors, and suppliers will, at all times, comply w[th same. if the <br />Contractor shall discover any provisions in the Contract Documents which are contrary to <br />ar inconsistent with .any such law, ordinance, rule, or regulation, the Contractor shall <br />immediately give notice thereof to the CMAR in writing, identifying any items of Work <br />affected, and the contractar shalt not proceed until the Contractor has received written <br />direction from the CMAR with respect to these items. if the Contractor performs contrary to <br />or inconsistently with any such taw, ordinance, rule; or regulation without giving such <br />notice, the Contractor shall bear alt costs which are a consequence of such performance. <br />3.4 At times selected by fhe CMAR after execution by the Contractor of the Construction <br />Agreement, apre-construction conference shall be scheduled and conducted for the <br />benefit of the Project. <br />ARTICLE 4. t34NiyS <br />4.1 A performance bond in the full amount of the Contract Price, and subject to changes In the <br />Contract Price, may be required of the Gantractor~fo guarantee the faithful performance of <br />the Work in compliance with the Contract Documents, in such form as maybe required by <br />law and by the Owner. if required, the band shall be dated the same data as~ the <br />Construction Agreement and must be accompanied by a current copy ofi khe power of <br />atEorney for the attamey-ln-fact executing such bond on behalf of a surety company <br />licensed to do business in the state of North Carolina. <br />4.2 R payment bond in the full amount of the Contract Price, and subject to changes In the <br />Contract Price, may tie required of fhe contractar to guarantee the payment of all labor and <br />material casts or claims 'sn connection with compliance with the Contract. if required, the <br />payment band shall be in such form as may be required by law and by the Owner. Sold <br />band shall be dated and executed in the same manner as the performance band in <br />paragraph 4.1'. <br />ARTICLE 5. INSURANCE At~lD tNDEIVlNEi'Y <br />5.1 CONTRACTOR PROVIDED tl~1SURANCE <br />The Contractor shall, without limiting its obligations or liabilities, procure, pay far and <br />maintain such insurance as is required by law and as is requked by the Agreement to <br />protect the Contractor, the CMAR, the Owner, the Designer and any lender of the Owner <br />when the loan to fhe Owner is secured by the property on which the Project is located from <br />claims for damages for bodily injury, including death, and from claims for property damage <br />which may arise from the Contractor`s or its representatives', consultants', Subcontractors', <br />agenEs', ar employees' operations under this Agreement. Such insurance shall be of the <br />kinds and have limits of liability and coverages not Less than the minimum limits hereinafter <br />specified ar required by law, whichever is granter. The CMAR makes no representation as <br />to the adequacy ar sufficiency of such coverages. The following requirements shall in na <br />GENERAL CONDITIONS FOR CM AT RESK PROJECT 13 of 42 ,TUNE 2007 irD1T10N <br />