Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 The Wark ofi all trades under the Contract Documents shall be coordinated by the <br />Contractor in such a manner as to obtain the best workmanship possible for the Work and <br />all components of the Wark shall be installed or erected in accordance with the best <br />practices of the pacficular trade. <br />2.5 The Contractor shall fully complete the Work and shall be responsible for all of the Work <br />under the Gantract Documents to which the Construction Agreement applies. if the <br />Contractor is prevented from doing so by any limitation of the Gon#ract Documents, the <br />Contractor shall fmmediafeiy give notice thereof to the CMAR in writing before proceeding <br />with the construction In the area where the problem or timitafson exists. <br />2.6 Standard specl€ications ar manufacturers' literature, when referenced, shalt be of the taiest <br />revision or printing unless otherwise stated and is Intended to establish the minimum <br />requirements acceptable. <br />2.7 For those materials. specked without the use of brand names, the Contractor shalt submit <br />to the CMAR within thirty (30} days after its receiving the Construction Agreement far <br />signatures, any product that meets the express requirements of the Specifications; unless a <br />Langer #ime is agreed to in the Master Schedule. <br />Such Submittal shall Include manufacturer's data, test reports, performance data and <br />cer#tficafions, samples, erection details, and other applicable information as required to <br />permit determination by the Designer whether such proposed products are suitable. The <br />Designer shall be the sole judge as to the suitability of any proposed product. The burden <br />of proof of quality rests with the Contractor. <br />2,8 The Contractor is required to examine and read the complete set of Drawings and <br />Specifications for the Project far Infannation concerning the Wortc, because same of the <br />" " ` "~ 'Work for which the Contractor will be responsible may be indicated on ar in documentation <br />appiying~primarity to the Wark~of one ar more other separate prime contractors. No <br />allowance will be made for the Contractor's failure fo become familiar with the complete set <br />of Project Drawings and Specifications. <br />2.9 Contractor's requests for clarification or information shall clearly define the causets) of the <br />Contractor's request and, as appropriate, shalt include the Contractor's interpretation and <br />the Contractor's proposed solution. <br />ARTtCLE 3. PAMtLtAR1TY WITH WORK, CONDITIOi~JS Al1t? LAWS <br />3.1 The Contractor has investigated prior to bidding and is satisfied with all conditions affecting <br />the Work, including but not restricted to those bearing upon transportation, disposal, <br />handling and storage of materials, availability of tabor, water, electrical power, roads and <br />uncertainties of weather, or similar physical condittans at the Project site, and the character <br />of equipment and facilities needed prior to and during prosecution of the Work. The <br />Contractor is safisfred as io the character, quality and quant€ty of surface and subsurface <br />materials or obstacles to be encountered Insofar as this information is reasonably <br />asaer#ainable from inspection ofi the Project site, including alt exploratory work done by the <br />Owner, as west as from information presented by the Contract >?ocuments, ar any other <br />information made available to the Contractor prior to receipt of bids. Any failure by the <br />Contractor to become acquainted with the available Information shall not relieve the <br />Contractor from the responsibility far estimating properly the difficulty or cast of successfully <br />performing the Work. _ <br />3.2 The Contractor shall be entitled to rely upon all information furnished to the Cantractar in <br />writing by the CMAR with respect to the Project site and to make alE inferences from it that <br />GENERAL CC)NQITIO?~S FOR CM AT RISK PROJECT 7 of 42 JUNE 20x7 ED1TEOlb <br />
The URL can be used to link to this page
Your browser does not support the video tag.