Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.36 Subcontractor - A person, firm, or corporatlvn who has entered into a direct contract with <br /> the Contractor to perform any of the Work at the Project. <br />1.37 Submittal -Shop drawings, product data, samples, and ottter.documents required by the <br /> Contrast Dacuments to be submitted by the Contractor to the CMAR and the Designer. <br />1.38 Subm[#tat Register -See paragraph 132 of these General Conditions. <br />-1.39 Substantial Completion -The point at which the Work, and Work by other Contractors on or <br /> in connection with the Project, as determined by the Designer, is suffic"sently complete in <br /> accordance with the Contrast Documents that it can be benefic(aIly occupied lay the Owner, <br />- and the Wark can be utilized by the Owner for its intended use, and alt necessary permits <br /> and permiss[ons for Beneficial Occupancy and utilization having been obtained by the <br /> Contractor. All operations and maintenance manuals, Owner training, and as-built <br /> drawings must be submitted prior to Substantial Cornpletian being achieved. <br />1.40 Sub-subcontractor - A person or entity that has a direct or indirect contract with a <br /> Subcontractor to perform any of the Work at the Project. <br />1.41 Work -The construction and services required by the Contract Documents, including alt <br /> labor, materials, equipment, and services provided or to be provided by the Contractor to <br /> fulfill the Gontractar's obligations. <br />1.42 All references in the Contract Dacuments to the masculine shall be interpreted as including <br /> the feminine or neuter and ail references In the Gontract Documents to the singular or the <br /> plural shall be interpreted as includ[ng the other, as may be appropriate in the reasonable <br /> interpretation of the Contract Documents. <br />ARTICLE 2. GORREt_ATION, IiVTEF2PR~CTATtON AND INTENT OE CC>NTt;ACT pOCUMENTS <br />2--[ It is the intent of the Specifications and Drawings and oilier Contract Dacuments to <br />describe a complete Project in accordance with the Contract Documents. <br />2.2 The Contrast Documents are complementary-, what is called for by one is as binding as if <br />called for by alt, if the Contractor finds a conflict, error or discrepancy in the. Contract <br />Documents, the Contractor shall not[fy the CMAR in writing before proceeding with the. <br />Work affected thereby. [n resolving such conflicts, errors and discrepancies, the Gantract <br />bocuments shall be given preference in the following order: Construction Agreement, <br />Modifications, Addenda, Supplemental Conditions, General Conditions, Specifications, and <br />Drawings. Figure dimensions on Draw[ngs shall govern over scale dimensions, and <br />detailed Drawings shall govern over general Drawings. Any Work that may reasonably be <br />inferred from the Contrac# Documents as being required #o produce the intended result <br />shall be supplied whether or not it [s specifically called for. Work, materials or equipment <br />described in words which, so applied, have a welt known technical trade meaning shall be <br />deemed to refer to such meaning and to incorporate any recognized standards which are a <br />part of such meaning. <br />2.3 Miscellaneous items, accessories and work which are not specifically ment[oned, but which <br />are essential to produce a comple#e and properly operating instaltafran, ar useable <br />structure ar plant providing the [ndicated function shall be furnished and instaAed without <br />change in the Contract Price. Such miscellaneous items and accessories shall be of the <br />same quality standards,' Including material, style, finish, strength, class, 'weight and other <br />applicable characteristics, as specified for the major component of which the miscellaneous <br />item or accessory is an essential part, and shall be approved by the Designer before <br />installation. This requ[rement is not intended to include major components not covered by <br />ar Inferable from the Contract Documents. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 6 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.