1.1G Daylight Hours -The hours or portions of hours between sunrise and sunset local time.
<br />1.17 Designer(s) -The person or firm designated as the Designer in the Contract Documents, or
<br />fheir authorized representatives. The Designer; as referred io herein, shat( mean architect,
<br />Eandscape architect, andlor engineer. They wit! be referred to hereinafter as if each were of
<br />the singular number, masculine gender.
<br />1.18 Drawings -The Drawings are the graphic and pictorial portions of the Contract Documents,
<br />wherever Ivcated and whenever issued, showing the des'sgn, location, and dimensions of
<br />the Work, and generally including plans. elevations, sections, details, schedules and
<br />diagrams. A list of the Drawings is contained to the Supplemental General Conditions.
<br />1.19 f=ield Order - A written order issued by the Designer which ctarifes or interprets the
<br />Contract Documents or orders minor changes fn the Work in accordance with the Contract
<br />Documents. See paragraph 14.3 of these Genera( Conditions.
<br />1.20 Final Completion -The po}nk at which the Contractor has, as determined by the Designer,
<br />completed the Work, with the exception of guaranty and warranty obligations, and becomes
<br />ent}tied, upon the recommendation of the CMAR and the Designer and determinakian by
<br />the Owner, to final payment.
<br />1.21 The words "furnish," "furnish and install," "install," and "provide" or words with similar
<br />meanings shaiE be interpreted, unless otherwise stated, to mean furnish and install
<br />complete, in place and ready far service.
<br />1.22 Master Schedule -The CMAR shall prepare and maintain a Master Schedule for the
<br />Project. The Master Schedule shall specify the proposed start and finish dates for each
<br />major project acfivity including alt design and construction activities. The Master Schedule
<br />shall be included in the bid documents presented to bidders. The Master Schedule shall be
<br />revised and updated to include key activities from the approved Gontractvr's Construction
<br />Schedule, 2s described in the Contract Documents, inciuding proposed stark and finish
<br />dates.
<br />1.23 Modification - (A) a written amendment to the Contract Documents signed by the CMAR
<br />and the Contractor and identified therein as such, (B) a Change Order, (C) Construction
<br />Change Directive, or (D) a Field Order. A Modification may only be issued after execution
<br />of the Agreement.
<br />1.24 Notice -The term "notice" or "written notice" as used herein shall mean and include aI!
<br />written notices, demands, Enstructions, and claims approvals and disapprovals furnished by
<br />the CMAR, the Owner ar the Designer to obtain compliance with the requirements of the
<br />Contract Documents, as well as all written notices, demands, Instructions and claims
<br />furnished by the Gontractor as required by the Contract Documents. Where notice is
<br />required under the terms of the Contract Documents, written notice shall always be
<br />required, and oral or "constructive" notice shah be insufficient and ineffective as notice.
<br />Email ar other electronic delivery shat} be insufficient and ineffective as notice unless
<br />specifically allowed by the Supplementary Gonditions ar a Modifiicatian to the Agreement.
<br />Written notice shall be deemed to have been duty served on the date that it is delivered in
<br />person to the individual or to a member of the firm, to an officer of the corporation for whom
<br />it is intended, to an authorized representa#ive of such individuat, firm, or corporation, or on
<br />the date khat i# is mailed by registered or certified mail, return receipt requested, addressed
<br />to the Last business address of such individual, firm, or corporation known t4 the person
<br />giving the notice. Written notice may also be given by facsimile transmission, provided that
<br />proof of delivery is obtained, in the case of delivery in person, such delivery shalt not be
<br />effective unless and until a written and signed receipt showing the date and time of delivery
<br />is obtained.
<br />GENERAL GONO}TIOt'aS FOR CM AT RISK PROJEGT 4 of 42 JUNE 2007 EDITION
<br />
|