Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMAR shall be responsible for any deductibles associated with <br />this coverage. <br />8.2.1 Coverage Terms <br />The insurance shall provide for the cost of replacement for the <br />Work at the time of any loss. The insurance shall Include as <br />named insureds the Owner, the CMAR, the Contractors and <br />their subcontractors and shall insure against the loss from the <br />perils of fire and all risk coverage for physical loss or damage <br />due to theft, vandalism, collapse, malicious mischief, transit, <br />flood, earthquake, testing, or damages resulting from defective <br />design, negligent workmanship or defective material. The <br />CMAR shall obtain approval from the Owner before increasing <br />any coverage due to increases in construction costs. <br />8.2.2 Other Proaerty Insurance <br />[Not used.] <br />8.2.3 Partial Occupancy: If the Owner occupies or uses a part <br />or parts of the Project prior to substantial completion thereof, <br />such occupancy shall not occur until the Owner obtains <br />property insurance for the structure. <br />6.2.4 Notices and Recovery <br />If requested by the Owner, the CMAR shall provide the Owner <br />with copies of all policies thus obtained for (he Project. The <br />CMAR shall provide the Owner wish thirty (30} days advance <br />notice of cancellation, non-renewal or endorsement reducing or <br />restricting coverage. <br />8.2.5 Waiver of Subrogation <br />Tha Owner and the CMAR waive all rights against each other <br />and against the Contractors, consultants, agents and <br />employees of the other for damages occurring during <br />construction and covered by builders risk and any property <br />insurance required for this Project, excluding the Owner's <br />property insurance. The Owner and the CMAR shall each <br />require appropriate similar waivers from their contractors, <br />consultants and agents. This waiver does not appty to design <br />liability. <br />8.3 Indemnity <br />To the fullest extent permitted by law, the CMAR shall <br />indemnify and hold harmless the Owner, its employees, agents <br />(including ilia Designer}, officers, directors and partners from <br />and against any and ail damages and reasonable attorneys' <br />fees incurred by the Owner caused or arising out of the <br />negligent acts, errors or omissions of the CMAR, or any oilier <br />party for whom the CMAR is legally liable, in performance of <br />services under this Agreement The CMAR shall not be <br />required to indemnify any person against losses resulting from <br />a breach of contract or resulting from negligence, misconduct <br />or violation of taws on the part of any person indemnified <br />hereunder. <br />The CMAR shall procure and maintain insurance as required <br />by and set forth in this Agreement. <br />8.3.1 tndemnifcation by Designer <br />The Owner shall cause the Designer to indemnify and hold <br />harmless the Owner, its employees, agents and <br />representatives to the same extent and in the same manner <br />that the CMAR has provided indemnification for the Qwner <br />under Paragraph $.3. <br />8.3.2 indemnificafion by Contractors <br />The CMAR shall cause each Contractor to indemnify and hold <br />harmless the Owner, CMAR and Designer from and against <br />any and ail claims, demands, suits, damages, including <br />consequential damages and damages resulting from personal <br />injury or property damage, costs, and expenses and fees that <br />are asserted against the Owner, CMAR and the Designer and <br />that arise out of or result from negligent acts or omissions or <br />the breach of the Construction Contract by the Contractor, its <br />employees, agents and representatives in performing the <br />Work. <br />8.4 Bo~_ds <br />The CMAR shall purchase and provide 100% Performance and <br />Payment Bonds, which Bonds shall comply with the <br />requirements of the General Conditions. <br />ARTICLE 9 <br />TERMINATION AND SUSPENSION <br />9.1 Termination for Convenience <br />This Agreement may be terminated in whole or in part by the <br />Owner for convenience after seven (7} days written notice io <br />the CMAR. In the event of tem7ination pursuant to Paragraph <br />9.1, the CMAR shall either cancel or assign to the Owner ail <br />contracts with Contractors and other suppliers at the option of <br />the Owner. The CMAR shall be paid for the Cost of the Work <br />performed >n the date of termination, plus reasonable <br />termination expenses payable to Contractors under their <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.