Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.1.3 Payment of Additional Compensation <br />The CMAR shall submit invoices for additional compensation <br />with its invoice for Services and payment shall be made <br />pursuant to the provisions of Article 7 of this Agreement. <br />ARTICLE 6 <br />OWNER'S RESPONSIBILITIES <br />fi.1 Program <br />The Owner shaft provide to the CMAR complete information <br />regarding the Owner's requirements for the Project. <br />6.2 Decisions <br />The Owner shall examine information submitted by the CMAR <br />and shall render decisions thereto promptly. <br />6.3 Insurance <br />The Owner shall fumish the insurance that the Owner has <br />agreed to furriish as specified in Article 8. <br />6.4 Notice of Nonconformities <br />If the Owner observes or otherwise becomes aware of any fault <br />or defect in the Project or nonconformity with the Contract <br />Documents, the Owner shall give prompt written notice thereof <br />to the CMAR. <br />6.5 Approvals <br />The .Owner shall furnish required infornaton and approvals <br />and perform Its responsibilities and activities in a timely manner <br />to facilitate orderly progress of the Work in cooperation with the <br />CMAR, consistent with this Agreement, and in accordance with <br />the planning and scheduling requirements and budgetary <br />restraints of the Project. <br />6.6 designer <br />The Qwner shall retain a Designer whose services, duties and <br />responsibilities shalt be described in a written agreement <br />between the Owner and Designer. The services, duties, and <br />responsibilities of the Designer set out in the agreement <br />between the Owner and Designer shall be compatible and <br />consistent with this Agreement and the Contract Documents. <br />The Owner shall, in its agreement with the Designer, require <br />that the Designer perform its services in cooperation with the <br />CMAR, consistent with this Agreement and in accordance with <br />the planning, scheduling and budgetary requirements of the <br />Project as determined by the Owner. The terms and conditions <br />of the agreement between the Owner and the Designer shall <br />not be changed or waived without written notice to the CMAR <br />provided at the time of the change or revision. <br />6.7 8udaet <br />The Owner shall establish the Project and Construction Budget <br />and approve subsequent revisions deemed acceptable as <br />provided in this Agreement. <br />6.8 Separate Contracts <br />The Owner reserves the dght to contract separately with other <br />entities to complete portions of the Work of the Project, or to <br />deploy its awn employees to complete portions of the Work. If <br />the Owner contracts separately with any other parties, the <br />Owner shall cause alt such agreements to be compatible and <br />consistent with this Agreement. Each of the agreements shall <br />include waiver of subrogation as required herein. The CMAR <br />agrees to cooperate with the Owner and its separate <br />contractors and coordinate the Work of all parties, including the <br />Owner's forces or separate contractors.. Provided the CMAR <br />has reasonable advance nonce of the identity and duties of <br />separate contractors, the CMAR agrees to include coordination <br />and support of the Owner's separate contractors in the General <br />Conditions costs. Disputes or conflicts between the CMAR, the <br />Owner and any separate contractors shall be subject io dispute <br />resolution in accordance with the dispute resolution provisions <br />in Appendix A. <br />fi.9 Copies of Drawings and Specifications <br />The CMAR shall estimate the reasonable number of copies of <br />interim and final drawings, spedfications and Contract <br />Documents required by the CMAR, and shall obtain such <br />copies from the Designer ai the CMAR's expense. The <br />estimated cost of such copies shall be included in the <br />Guaranteed Maximum Price. <br />6.10 Permits and Approvals <br />With the cooperation and assistance of the CMAR and the <br />Contractors as set forth in this Agreement, the Owner shat) in a <br />timely manner secure, submit and pay for necessary approvals, <br />easements, assessments, permits and charges required for the <br />construction, use or occupancy of permanent structures, or for <br />permanent changes in existing facilities. <br />6.11 Funding Requirements <br />The Owner shall describe the funding for the Project to the <br />CMAR and the Designer. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.