Orange County NC Website
Appendix E Page 14 of 22 <br />To the Contract between Orange County and The RESOCIlTE Building Company for Orange County <br />Emergency Services Center <br />~~V~E <br />Orange County Emergency Services Center - GMP Proposal <br />Proposal Criteria <br />THE RE60LUTE BUILDING COMPANY -yl- <br />- I <br />9. The Proposal is based on the expectation that the Substantial Completion Date be defined <br />as the date of receipt of the Certificate of Occupancy issued by the governing regulatory <br />agency unless that issuance is delayed by reasons} beyond the control of the CM. <br />1t). The Proposal is based on the CM and its Subcontractors providing industry standard <br />twelve (12} month warranty which shall commence the first day following the Substantial <br />Completion Date of the respective areas. <br />11. The Proposal includes several ALLOWANCES. Certain allowances are intended to be <br />furnish and install {provide) allowances while others may be intended solely far material or <br />labor. Refer to the Proposal for included allowances. <br />Division 1: General Project Criteria <br />1. The Proposal includes costs for the Building Permit. <br />2. The Proposal includes costs for Payment and Performance Bonds to be provided by the <br />CM. <br />3. The Proposal includes General Liability Insurance premiums. <br />4. The Proposal includes Builders Risk for that portion of work included in the contract. It <br />does not include "all peril" insurances for existing structures. <br />5. The Proposal is based on reasonably clear and unobstructed use of the existing site and <br />facility by the CM and its Subcontractors for waste removal, material staging and <br />construction personnel with the ultimate intent of maintaining construction sequence and <br />time. The CM will cooperate with the Owner so as not to intertere with ongoing business <br />operations. <br />6. The Proposal is based on material manufacturer's standard products, profiles, colors, etc. <br />In general, the Proposal has been compiled from industry standards that align with the <br />existing facility and the described design intent communicated to date. <br />7. The Proposal is based on the CM and its Subcontractors being afforded the opportunity, <br />throughout the duration of the project, to provide substitutions of products or methods that <br />may reasonably benefit the project. All substitutions shall be submitted to the owner and <br />designer for approval slang with any savings. <br />8. The Proposal and Schedule are based on historically average weather conditions. The <br />CM will endeavor to minimize cost or time implications associated with abnormal weather. <br />8. The Proposal has excluded permanent utility usage casts, including but not limited to, <br />telephone, Internet, electricity, water, steam, sewer, chilled water and gases, etc. <br />H:1F~CPIPROJECTS\OCESCVtppendix E\6-Proposal Cdleda.doc 2 <br />