Browse
Search
Agenda - 12-11-2007-4lxtr
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4lxtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:47:35 PM
Creation date
8/28/2008 10:40:15 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4lxtr
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY AGREEMENT FOR CONSTRUCTION <br />NORTH CAROLINA MANAGER AT RISK SERVICES <br />This AGREEMENT is made and effective on this date: <br />BETWEEN The Owner: ' <br />ORANGE COUNTY, NORTH CAROLINA (hereinafter referred to as "Owner" or "the Owner") <br />And the Construction Manager At Risk (hereinafter referred to as "CMAR" or "the CMAR"): <br />RESOLUTE BUILDING COMPANY, INC. <br />For services in connection with the Project known as: <br />The EMERGENCY MANAGEMENT SERVICES FACILITY, Hillsborough, North Carolina, as further <br />described in Article 2 <br />For which the Designer is: <br />CORLEY, REDFOOT, ZACK ARGHITECTS & ENGINEERS, ATTN: KEN REDFOOT, 222 CLOISTER <br />COURT, CHAPEL HILL, NC 27514 <br />The Owner and CMAR, in consideration of their mutual covenants herein, agree as set forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 -RELATIONSHIP OF THE PARTIES ....... <br />1.1 Owner and Construction Manager At Risk <br />................................................................. 4 <br />1.2 Owner and Designer <br />1.3 CMAR and Contractors <br />1.4 Relationshfo of the CMAR to the Designer <br />ARTICLE 2 -PROJECT DEFINITION .......................................................................................................... 4 <br />ARTICLE 3- CONSTRUCTION MANAGER AT RISK'S SERVICES ................................................................... b <br />3.1 CMAR Services <br />3.2 CMAR Personnel <br />3.3 Construction Management Pian <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Manag_ ment <br />3.7 Manacement Information System {MISS <br />3.8 design Phase Services <br />3.9 Procurement Phase <br />3.1t) Construction Phase <br />3.11 Post Construction Phase <br />
The URL can be used to link to this page
Your browser does not support the video tag.