Browse
Search
Agenda - 12-11-2007-4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-11-2007
>
Agenda - 12-11-2007-4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:48:37 PM
Creation date
8/28/2008 10:40:02 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes - 20071211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.~ <br />].1.3 PRQ.IECT TEAM <br />1.1.3.1 The Owner's Designated Representative is: <br />(List name, address anct other infnrnlation.) <br />Pam Jones <br />County of Orange <br />Department of Purchasing and Central Services <br />P.O. Box 8181 <br />129 East King Street, Hillsborough, NC 27278 <br />7.13.2 "h'he persons or entities, in addition to the Owner's Designated Representative, who are <br />required to review the Architect's submittals to the Owner are: <br />(List name, address and other information.) <br />1.1.3.3 The Owner's other consultants and contractors are: <br />(Lisa discipline and, i~'knowrr, identify theist Uy Warne and address.) <br />1.1.3.4 't'he Architect's Designated Representative is: <br />(List name, address and other information.) <br />Samuel Brockwell, AIA <br />Brockwell Associates, Tnc. <br />1911 Hillandale Road, Suite 1450 <br />Durham, NC 27705 <br />1.1.3.5 The consultants retained at the Architect`s expense are: <br />{List discipline and, if known, identify them fry name and address.) <br />Steve McDaniel <br />Gardner & McDaniel, P.A. <br />P.Q. Box 51967 <br />Durham, NC 27717 <br />Structural Engineers <br />1.1.4 Other important initial information is: <br />EDI <br />Engineered Designs, Inc•: <br />5540 Centerview Drive, Suite 315 <br />Raleigh, NC 27609 <br />Plumbing, Mechanical & Electrical Engineers <br />1.1.5 ~Nhen the services lulder this Agreement include contract adaninistration services, the I,'~ <br />General Conditions of the Contract For Construction shall be the edition of AIA Document Azo1 0, o <br />current as of the date of this Agreement, or as follo~+Ts: oa~o <br />L~J1997 AIA <br />AIA DOCUMENT 81411997 <br />1.1.8 The information contained in this A1-ticle is may be reasonably relied upon by the Owner STANDARD FORM <br />and Architect in determining the Architect's compensation. Both parties, ho~~~ever, recognize that AGREEMENT <br />such information inay change and, in that event, the Owner and the Architect steal! negotiate The American Institute <br />appropriate adjustments in schedule, compensation and Change in Ser+~ces in accordance ~+*ith of Architects <br />1735 New York Avenue, N.W. <br />Paragraph 1.3.3• <br />Washington, D.C. 20006-5292 <br />+1IAftNING: Unlicensed photocopying violates U.5. copyright laws and will subject the violator to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.