Orange County NC Website
<br />-1 <br />ARTICLE 7.1 INITIAL lNFQRMATION <br />7.1.1 't'his Agreement is based on the follo~azng inFot7nation and assumptions. <br />(trote the disposition for the following items by inserting the requested infortnativn ot• a statement such as "not <br />applicable," "rrnknowrT at time of execution" or "to he determined later by mt.ttuaI agreement.") <br />1.1.2 PROJECT PARP+METERS <br />1.7.2.7 1'he objective or use is: <br />(Identify a• describe, if appt~priate, proposed t.tse or goats.) <br />The projects will house a new Library and Departmental Offices for <br />the County of Orange. <br />1.1.2.2 The physical parameters are: <br />(Identify or describe, tf appropriate, sine, tocatiorr, diraTe,tsions, or other periirreni infw•nzation, <br />such as geotechnical reports about the site.) • <br />1.1.2.3 "1'he Owner's Program is: <br />(Identify documerttntion or state the rtzanner in which the program u~itt be developed.) <br />A Facility Program wi11 be prepared for the departmental offices as designated <br />by Orange County to be located in the Of.fiee Building. The program for the <br />Library will be developed by a Library Consultant to be hired directly by <br />1.1.2.4 The legal parameters are: Orange County. <br />(Identify pertinent legal information, inclarding, if appropriate, tend sun~eys and legal descriptions and <br />restrictions of the site. ) <br />1.7.2.5 The financial parameters are as follows. <br />a Amount of the Owner's overall- budget far the Project, including the Architect's <br />compensation, is: <br />.z Amount of the Owner`s budget for the Cost of the Work, excluding the Architect's <br />compensation, is: <br />1.1.2.6 The tinge parameters are: <br />(Iderttif}; if eppropriate, milestone dutes, duratiau yr jest track scheduling.) <br />1.1.2.7 '1'lae proposed procurement or delivery method for flee Project is: <br />(Identify rndthod such as competiti+~e bi.d> rzegvtiated contract, or construction ntanugenrent.) <br />Construction Manager at Risk. Itl~ <br />a, o <br />1.1.2.8 Other parameters are: ~ °ci'+~s'a° <br />(Identify special clzaracieristics or needs of ilte project such as enerbry, envirorurterztul or historic preservutivrz ~ <br />requirements.) ®t e 9~ n l A <br />AIA DOCUMENT 8741-1997 <br />STANDARD FORM <br />• AGREEMENT <br />The American Institute <br />of Architects <br />1735 New York Avenue, N.W. <br />Washington, D.C. 20006-5292 <br />WARNING: Unlicensed photocopying violates US. copyright laws and will subject the violator to iegat prosecution. <br />