Orange County NC Website
~7 <br />Gateway Center -Building #2 <br />Engneered Designs, Inc. <br />from the date of proposal. If project authorization or design has not commenced within the 30-day period, <br />all fees are subject to review and alteration. <br />~tative Date <br />..- <br />Page 3 <br />~~/~.. <br />