Orange County NC Website
State of North Carolina Reviewing Office: RRO 24 <br /> Department of Environment and Natural Resources <br /> INTERGOVERNMENTAL REVIEW e PROJECT COMMENTS Project Number 15-0597 Due Date: 5/25/2015 <br /> County ORANGE <br /> After review of this pr'oiect it has been delennined that the ENR perinit(s)andlor approvals indicated may need to be obtained in order for this project to cotatply with <br /> North Carolina Law.Questions regarding these pennits should be addressed to the Regional Office indicated on the reverse of the fonn.All apphcations,information <br /> and guidelines relative to these plans and pennits are available from the same Regional Office. <br /> Normal Process Time <br /> PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS (statutory time limit) <br /> Permit to construct&operate wastewater treatment facilities, <br /> ® sescer system extensions&sewer systems not discharging Application 90 days before begin coustruction or award aCconstruction 34 days <br /> into state surface maters. contracts On-site inspection.Post-application technical con€ereace nsual. (90 days) <br /> NPDES-permit to discharge into surface water and/or Application 180 days before begin activity.On-site inspection.Pre- <br /> permit to operate and construct wastewater facilities application conference usual.Additionalty,obtain permit to construct 90-120 days <br /> discharging into stale surface waters. <br /> wastewater treatment facility-granted afler NPDES,Reply time,30 days ii der (NIA) <br /> receipt of plans or issue of NPDES permit-+whichever is later. <br /> ❑ Water Use Permit Pre-application technical conference usually necessary 30 days <br /> (NIA) <br /> ® Well Construction Permit Complete application must be received and permit issued prior to the 7 days <br /> installation ofa well. 0 5 days) <br /> Application copy must be served on each adjacent riparian property owner. <br /> ❑ Dtadgc and Fill Pennit On-site inspection.Pre-application conference usual,Filling may require 55 days <br /> Easement to Fill firm N.C.Department of Administration and (90 days) <br /> Federal Dredge and Fill Permit. <br /> Permit to construct&operate Air Pollution Abatement Application must be submitted and permit received prior to <br /> ❑ facilities andlor Emission Sources as per 15 A NCAC, construction and operation or the source. if a penrrit is required in an 90 days <br /> (2Q,01 04 thin 2Q.0300) <br /> area without local zoning,then there are additional requirements and y <br /> timelines(2€x3.01!3). <br /> 1 `1 Permit to construct&operate Transportation Facility as per Applical ion must be submitted at least 90 days prior to construction 90 days <br /> l 1 I SA NCAC QD.0F 00,2Q.0601 or modification of the source. <br /> rn Any open burning associated with subject proposal must be <br /> in compliance with 15 A NCAC 2D.1900 <br /> Dernolilion or renovations or structures containing asl^_estos <br /> ® material must be in compliance with 15 A NCAC 20.1110 <br /> (a)(1)which requires notification and removal prior to NIA 60 days <br /> (40 days) <br /> demolition.Contact Asbestos Control Group 919-707-5950 <br /> E] Complex Source Permit required under 15 A NCAC <br /> 2D.0800 <br /> Tire Scdimcntation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity.An erosion&sedimentation <br /> ® control plan will he required if one or more acres to be disturbed.Plan filed with proper Regional Office(Land Quality Section)At least 30 20 days <br /> days before beginning activity.A fee orS65 for€he first acre or any part of an acre. An express review option is available with additional (30 days) <br /> fees. <br /> Sedimentation and erosion control must be addressed in accordance wish NCDOT's approved program. Particular attention should be given (30 days) <br /> to design and installation ofappropriate perimeter sediment trapping devices as well as stable stormwater conveyances and outlets. <br /> On-site inspection usual.Surety bond filed with L•NR Bond amount varies <br /> ❑ Mining Pcmtii with type mine and number of acres of affected land,Any are mined greater 30 days <br /> than one acre must be permitted.The appropriate bond trust be reccived (60 days) <br /> before the pemtil can be issued. <br /> ® <br /> North Carolina Burning inspection by N.C.Division Forest Resources if permit cscecds 4. 1 day <br /> Burning permit days (NiA) <br /> ❑ <br /> Special Ground Clearance Burning Permit 22 On-site inspection by N.C.Division Forest Resources required"if more than <br /> - I day <br /> counties in coastal N.C.with organic soils live acres of ground clearing activities are involved.Inspections should be (NIA) <br /> requested at(cast tca days before actual burrs is planned." <br /> ❑ Oil Relining Facilities NIA �—— 90-120 days <br /> (NIA) <br /> If permit required,application 60 days before begin construction.Applicant <br /> must hire N.C.qualified engineer to:prepare plans,inspect constructionr <br /> certify construction is according to FNR approved plans.May also require <br /> ® Dam Safety Permit permit under mosquito control program.And a 404 permit from Corps of 30 days <br /> Engineers.An inspection of site is necessary to verify Hazard Classification. (64 days) <br /> A minimum fee of 5200.00 must accompany the application.An additional <br /> processing fee based on a perecnlage or the total project cost will be required <br /> upon completion. <br />