Browse
Search
Agenda - 10-06-2015 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 10-06-2015 - Regular Mtg.
>
Agenda - 10-06-2015 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 8:27:29 AM
Creation date
10/5/2015 10:54:51 AM
Metadata
Fields
Template:
BOCC
Date
10/6/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 10-06-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> STAFF COMMENT. The following testimony/evidence was entered into the record at the <br /> public hearing- <br /> i. Staff abstract and attachments, including the SUP application and Master Plan, <br /> presented at the May 26, 2015 Quarterly Public Hearing. <br /> ii. Staff testimony on the project and its compliance with various provisions of the <br /> UDO. <br /> iii. Applicant sworn testimony from the applicants and their consultants. <br /> The applicant entered copies of affidavits and a real estate report, completed <br /> by Mr. Vic Knight, into the record providing additional information on the <br /> project's compliance with applicable standards. <br /> iv. Comments from the BOCC, Planning Board, and the general public. <br /> During the hearing, the following comments/questions were posed concerning the application: <br /> • BOCC and Planning Board members requested clarification on the process <br /> for site plans and development following the SUP approval, roadway and <br /> pedestrian crossing improvements, Environmental Health permitting and <br /> wells. <br /> RESPONSE: The applicant testified, and staff confirmed, that the project <br /> would require additional permitting with NCDOT for roadways, <br /> encroachments and crossings; NCDEHNR for the state approved septic <br /> field; Site Plans and Stormwater/Erosion Control Permits with Orange <br /> County Planning; and building permits with Orange County Inspections. <br /> Approval of this SUP and Master Plan allows the applicant to move <br /> forward with the school's long-term vision for the school without multiple <br /> revisions to the SUP. <br /> It should be noted there was no competent material evidence or expert testimony entered into <br /> the record demonstrating the project did not comply with the UDO. An excerpt from the minutes <br /> from the public hearing is contained within Attachment 3. <br /> Agenda materials from the July 1, 2015 Planning Board meeting can be viewed at- <br /> ht!p-://www.oranqecountvnc.qov/Planninq Board Agenda Packet July 2015.pdf. The abstract <br /> and handouts from this meeting are contained in Attachment 2. An excerpt of minutes from this <br /> meeting are contained within Attachment 4. <br /> Additional information, as contained within this abstract, will be entered into the record at the October <br /> 67 2015 regular meeting. <br /> Proposal: As testified at the Public Hearing, the applicant is requesting to modify and expand the <br /> existing school campus. <br /> Part of the request is to have the County approve a Master Plan detailing the construction and <br /> location of new buildings and support facilities over the next 15 years. The plans are envisioned <br /> to support an increase in student population to approximately 350 students by 2030. Currently <br /> the school has 259 students enrolled. If the request is approved, the school is expected to see <br /> an increase of 91 students over the next 15 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.