Browse
Search
Agenda - 09-29-2015 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-29-2015 - Joint Mtg. - School Boards
>
Agenda - 09-29-2015 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 9:39:53 AM
Creation date
9/28/2015 9:27:43 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2015
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes 09-29-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATIONS <br />• Deconstruct Building A and construct an addition to house <br />the current program spaces as well as the deficient program <br />spaces <br />• Create a new accessible and secure main entry for students, <br />staff and visitors. <br />• Address the oldest building on the high school campus and the <br />major mechanical issues. <br />• Connects more of the campus internally <br />• Renovate all existing buildings <br />• Eliminate mobiles on site <br />MOSELEYARCHITECTS <br />CHAPEL HILL HIGH SCHOOL <br />CURRENT CONDITIONS: 6 <br />• Deteriorated facility conditions <br />• Building "A" houses most of the classrooms and science rooms <br />that are smaller than the School Construction Standards <br />• Fourteen mobile units on -site housing 9 academic classrooms, <br />Ridge, 2 Blue Ribbon classrooms, & 2 health classrooms <br />• Drama, dance, wrestling, & weight rooms are significantly <br />undersized <br />• Staff support space is undersized and inefficiently configured <br />• Campus -style layout lacking connection between the four <br />buildings <br />• Major site drainage issues <br />• Main entrance is not ADA accessible <br />• Ramp between Main Building "A" and A2 does not meet Code <br />• Aging mechanical systems causing humidity issues <br />Year Built: 1965 <br />Additions: 1969, 1973, 1975,1983, 1990, 1994, 1996, 1997, 2003 <br />Last Renovation: 2007 <br />Area: 256,405 sf <br />Acres: 87.4 <br />Student Capacity (per SAPFO): 1520 Students <br />2013 ADM: 1,432 Students <br />Constructio Load - bearing concrete block & steel frame <br />HAPEL HILL <br />ARRBOR0 <br />i` ._ir1 0 4-'e Hn;>>.s <br />
The URL can be used to link to this page
Your browser does not support the video tag.