Browse
Search
Agenda - 09-29-2015 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-29-2015 - Joint Mtg. - School Boards
>
Agenda - 09-29-2015 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 9:39:53 AM
Creation date
9/28/2015 9:27:43 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2015
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes 09-29-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATIONS <br />• Eliminates life safety issues in Building 100 by deconstruction <br />and building new academic wing <br />• Provide a new administration suite main entrance <br />• Moves queuing off of the road <br />• Connects all existing building internally <br />• Renovate all existing buildings <br />• Increase capacity by 52 seats. <br />MOSELEYARCHITECTS <br />CARRBORO ELEMENTARY SCHOOL <br />CURRENT CONDITIONS: 5 <br />• One mobile unit on -site <br />• 100 classroom wing has dead -end corridors and does not meet <br />the current NC State Building Code <br />• Administration area, cafeteria, kitchen and staff support spaces <br />are too small <br />• Program deficiencies - art room and 5 smaller classroom spaces <br />• Existing queueing for parent drop -off occurs on Shelton Street <br />• Stacking traffic onto the public right of way is a safety concern <br />• Aging mechanical system <br />• Campus -style layout lacking connection from main building to <br />the multipurpose building <br />• Modular walls between classrooms causing noise transfer <br />between classrooms <br />Year Built: 1957 <br />Additions: 1964, 1989 <br />Last Renovation: 2011 <br />Area: 61,562 sf <br />Acres: 17.7 <br />Student Capacity (per SAPFO): 533 Students <br />2013 ADM: 468 Students <br />Construction: Precast concrete frame with brick infill and <br />built -up roof <br />HAPEL HILL <br />A�ORO <br />,i .,.;t�C;,.11.s <br />
The URL can be used to link to this page
Your browser does not support the video tag.