Browse
Search
Agenda - 09-29-2015 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-29-2015 - Joint Mtg. - School Boards
>
Agenda - 09-29-2015 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 9:39:53 AM
Creation date
9/28/2015 9:27:43 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2015
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes 09-29-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />Facilities Assessment of Oldest Schools <br />Phasing Plan <br />School Name Scope of Work Est. Cost and <br />Funding Source <br />- Eliminates dead -end corridors in 100 wing by deconstruction and <br />building new academic wing <br />Phase 3 <br />CARRBORO <br />Provide a new administration suite & main entrance <br />$13.55M <br />Unfunded <br />ELEMENTARY <br />Moves queuing off of the road <br />Future Capital <br />Increase capacity by 52 seats <br />Deconstruct all of Building "A" <br />Creates a new entry/ admin suite that is accessible and secure <br />Phase 1 <br />CHAPEL HILL <br />Addresses oldest building and major mechanical issues <br />$52.41M <br />Potential 2016 <br />HIGH SCHOOL <br />BOND <br />Connects more of the campus <br />Referendum <br />Increases capacity by 105 seats <br />Phase 3 <br />CULBRETH <br />Renovate existing building <br />$5.80M <br />Unfunded <br />MIDDLE <br />Future Capital <br />Renovate & reorganize the layout of the main building <br />Phase 2 <br />Relocated the administration suite to the street front & provide a <br />Request Access <br />EPHESUS <br />new main entry <br />$15.54M <br />to Planned <br />ELEMENTARY <br />- Provide additional program space to eliminate mobiles & bring <br />New Schools <br />school up to space standards <br />Funds <br />Increase capacity by 137 <br />Provide an administration addition at front to provide necessary <br />staff space as well as a secure main entry <br />Phase 2 <br />- Classroom wing deconstruction and addition at rear of the school <br />Request Access <br />ESTES HILLS <br />Enclose breezeways to connect all classrooms with interior <br />$16.73M <br />to Planned <br />ELEMENTARY <br />corridors <br />New Schools <br />- Provide new queuing configuration <br />Funds <br />Increase capacity by 58 seats <br />Renovate admin area and main building lobby <br />FRANK PORTER <br />Phase 3 <br />GRAHAM <br />Add new lobby entry for security and additional admin space <br />$5.48M <br />Unfunded <br />Provide more prominent front door and secure main entrance <br />ELEMENTARY <br />Future Capital <br />Renovate existing buildings <br />Phase 1 <br />Maintain existing buildings <br />GLENWOOD <br />Provide small administrative addition to Provide secure main <br />$0.82M <br />Potential 2016 <br />ELEMENTARY <br />BOND <br />entrance and necessary staff space <br />Referendum <br />- Deconstruct the existing Lincoln Center <br />Phase 1 <br />- Construct a building to house both Pre -K program & new central <br />LINCOLN <br />office <br />$22.62M <br />Potential 2016 <br />CENTER <br />BOND <br />Increase elementary capacity by 189 <br />Referendum <br />Increase high school capacity by 50 - 100 <br />Phase 2 <br />Renovate existing building <br />Request Access <br />PHILLIPS <br />Provide additional program space to meet space standards including <br />$9.40M <br />to Planned <br />MIDDLE <br />increasing the admin suite to provide a secure main entry <br />New Schools <br />Funds <br />- Deconstruct the five classroom pod <br />Phase 2 <br />Renovate the existing buildings <br />Request Access <br />SEAWELL <br />Provide additional program space to meet space standards &replace <br />$15.74M <br />to Planned <br />ELEMENTARY <br />deconstructed classrooms <br />New Schools <br />Incrase capacity by 119 <br />Funds <br />Preliminary Construction Phasing & Temp. Facilities Cost: $2.98M <br />Total Estimated Cost: $161.08M <br />
The URL can be used to link to this page
Your browser does not support the video tag.