Browse
Search
Agenda - 09-29-2015 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-29-2015 - Joint Mtg. - School Boards
>
Agenda - 09-29-2015 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 9:39:53 AM
Creation date
9/28/2015 9:27:43 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2015
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes 09-29-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAPEL HILL— 2a <br />Older Facility Recommendations 3 <br />ORO and the 2015 -25 CIP <br />CITY SCHOOLS <br />Key Elements of Older Facility Recommendations <br />(included in the 2015 -25 CIP Recommendation) <br />The recommendations are for a comprehensive program that focuses on the district's <br />ten oldest schools that accommodate almost 50% of district students. <br />Facility recommendations include: <br />✓ Correction of building code violations; <br />✓ Improved safety by consolidating operations and controlling entry; <br />✓ Indoor air quality deficiencies and health concerns addressed; <br />✓ Replacement of malfunctioning mechanical equipment; <br />✓ Relief of traffic congestion problems; <br />✓ Deconstruction of some inefficient buildings; <br />✓ Extending the life of the schools. <br />Implementation of the recommendations eliminate mobile classrooms (also in need of <br />renovations) while providing additional student capacity. <br />✓ Elementary school capacity increase = 555. <br />✓ High school capacity increase = 230 +/- <br />Increased student capacity would result in deferment of new elementary school and <br />high school additions well beyond the ten -year CIP window. <br />✓ Board requesting the redirection of $57.6 million in projected capital expenditures <br />for new schools towards "Phase 2" older facility recommendations. <br />✓ Delays significant operational increases with opening a new school. <br />• Bond funds and future capital funds directed to the ten oldest schools will make <br />available CIP (Paygo) revenue for needed maintenance at district's other "newer" <br />schools that are 20 -30 years of age. <br />X20;. _ <br />� x <br />rFdvca .r <br />Chapel Hill- Carrboro City Schools <br />750 S. Merritt Mill Road — Chapel Hill, NC 27516 — 919 - 976 -8211 — http: / /www.chccs.kl2.nc.us <br />750 S. Merritt Mill Road— Chapel Hill, NC 27516 1919-967-8211 x28227 I http: / /www.chccs.kl2.nc.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.