Orange County NC Website
RECOMMENDATIONS <br />• Deconstruct the five classroom pods. <br />• Renovate the existing administration/dining building & Lowler <br />Building. <br />• Eliminate use of mobiles as classrooms <br />• Provide additional program space to meet space standards & <br />replace deconstructed classroms (do not increase kitchen). <br />• Increase capacity by 119. <br />MOSELEYARCHITECTS <br />SEAWELL ELEMENTARY SCHOOL <br />CURRENT CONDITIONS: <br />14 <br />• Operating over capacity <br />• Six mobile units on -site housing classroom space <br />• Administration area, physical education area & staff support <br />areas are too small <br />• Media center support spaces are lacking <br />• Lack of storage rooms <br />• Aging mechanical system <br />• Campus -style layout with classrooms exiting to the exterior <br />• Aging kitchen equipment <br />• Exterior structural remediation needed at one of the classroom <br />pods <br />Year Built: 1969 <br />Additions: 1975, 1989 <br />Last Renovation: <br />Area: 55,629 sf <br />Acres: 87,5 <br />Student Capacity (per SAPFO): 466 Students <br />2413 ADM: 539 Students <br />Construction: Load bearing brick construction appears to be the <br />main structural system for the original building and load bearing <br />CMU and steel frame construction for the 1989 addition <br />HAPEL HILL <br />TORO <br />,i I T, 0 F'r CC ,,,1.s <br />