Orange County NC Website
RECOMMENDATIONS <br />• Construct addition for expansion of administration and <br />dining/kitchen. <br />• Provide more prominent front door and secure main entrance <br />• Renovate existing buildings. <br />FRANK PORTER GRAHAM ELEMENTARY <br />CURRENT CONDITIONS: 10 <br />• Magnet Spanish dual - language school <br />• Two mobile units on -site <br />• Kitchen. dining, & staff support areas are too small <br />• Existing reception area is in a large open lobby that is not secure <br />• Water infilitration issues in Building 5 <br />• Campus -style layout <br />• Aging mechanical system <br />Year Built: 1969 <br />Additions: 1977, 1989 <br />Last Renovation: 2012 <br />Area: 68,513sf <br />Acres: 9.8 <br />Student Capacity Taper SAPFO): 538 Students <br />2013 ADM: 491 Students <br />Construction: Load bearing CMU walls with brick veneer; <br />built -up roof over a poured- gypsum deck & pre -cast exterior wall <br />construction <br />f <br />HAPEL HILL - <br />MOSE LEYARC H I TECTS APMaRo <br />