Browse
Search
Agenda - 09-29-2015 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-29-2015 - Joint Mtg. - School Boards
>
Agenda - 09-29-2015 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 9:39:53 AM
Creation date
9/28/2015 9:27:43 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2015
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes 09-29-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATIONS <br />Provide an administration addition at front to provide necessary <br />staff space as well as a secure main entry <br />• Classroom wing deconstruction and addition at rear of the <br />school including Pre -K classroom <br />* Enclose breezeways to connect all classrooms with interior <br />corridors <br />* Realign the parent drop -off and combine the bus loop with <br />Phillips Middle School to eliminate stacking on Estes Drive <br />Connect internally most of the campus <br />Eliminate mobile classrooms <br />• increase capacity by 58 seats <br />ESTES HILLS ELEMENTARY SCHOOL <br />CURRENT CONDITIONS: 9 <br />• Two mobile units on -site housing Pre -K and a science room <br />• Most classrooms are 28 to 33% smaller than the current School <br />Construction Standards program <br />• Program deficiencies, including 4 smaller classroom spaces, <br />administration and staff support spaces <br />• Classrooms in the 1957 building exit to exterior breezeways and <br />are not secure <br />• Aging mechanical system <br />• Queuing forces stacking in the public right of way <br />Year Built: 1957 <br />Additions: 1985, 1998 <br />Last Renovation: 2011 <br />Area: 58,442 <br />Acres: 33.1 <br />Student Capacity (per SAPFO): 527 Students <br />2013 ADM: 499 Students <br />Construction: Load- bearing CMU walls with brick veneer & <br />built -up roof over a poured- gypsum deck. <br />Ap�ffll <br />LWI <br />I WEL HILL - <br />CISELEYARCH ITE TS �oR0 <br />ti., r r • 0 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.