Browse
Search
2015-499-E DEAPR - W. L. Bishop to construct Hollow Rock parking area
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-499-E DEAPR - W. L. Bishop to construct Hollow Rock parking area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2016 12:16:02 PM
Creation date
9/14/2015 10:54:44 AM
Metadata
Fields
Template:
BOCC
Date
9/11/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$82,603.00
Document Relationships
2016-112-E DEAPR - W.L. Bishop - Change Order to 2015-499-E for wet soil
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
R 2015-499-E DEAPR - W. L. Bishop to construct Hollow Rock parking area
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 17FB3C83-7C50-4853-BFFF-C3701731 F099 <br /> a. Contractor acknowledges that Owner is a governmental entity, and the validity of this <br /> Agreement is based upon the availability of public funding under the authority of its <br /> statutory mandate. <br /> b. In the event that public funds are unavailable and not appropriated for the performance of <br /> Owner's obligations under this Agreement, then this Agreement shall automatically expire <br /> without penalty to Owner immediately upon written notice to Contractor of the <br /> unavailability and non-appropriation of public funds. It is expressly agreed that Owner <br /> shall not activate this non-appropriation provision for its convenience or to circumvent the <br /> requirements of this Agreement, but only as an emergency fiscal measure during a <br /> substantial fiscal crisis. <br /> c. In the event of a change in the Owner's statutory authority, mandate and/or mandated <br /> functions, by state and/or federal legislative or regulatory action, which adversely affects <br /> Owner's authority to continue its obligations under this Agreement, then this Agreement <br /> shall automatically terminate without penalty to Owner upon written notice to Contractor <br /> of such limitation or change in Owner's legal authority. <br /> 10. NOTICES <br /> Any notice required by this Agreement shall be in writing and delivered by certified or registered <br /> mail, return receipt requested to the following: <br /> Owner: Contractor: <br /> Orange County W. L. Bishop Construction <br /> Attn: Marabeth Carr W. L. Bishop <br /> P.O. Box 8181 2211 Leah Dr. <br /> Hillsborough,NC 27278 Hillsborough,NC 27278 <br /> 11. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any <br /> Duties and Obligations imposed by state, federal or local law, rules, regulations and <br /> ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br /> duty granted them under the Contract Documents, nor shall any act or failure to act <br /> constitute any approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as <br /> required by law. Unless prohibited by law the costs of all such tests and inspections <br /> related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, <br /> Mechanical and Building Codes shall be borne by the Contractor. The costs for material <br /> and structural testing shall be conducted by an independent third party at the expense of the <br /> Owner. Delays related to any of the aforementioned tests and inspections shall not be <br /> grounds for delaying the completion of the work. If any such tests and inspections reveal <br /> deficiencies in the Work such that the Work does not comply with terms or requirements <br /> of the Contract Documents and/or the requirements of any code or law the Contractor is <br /> solely responsible for the cost of bringing such deficiencies into compliance with the terms <br /> of the Contract Documents and/or any code or law. <br /> Revised 10114 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.