Browse
Search
Agenda - 09-15-2015 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-15-2015 - Regular Mtg.
>
Agenda - 09-15-2015 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2015 9:08:00 AM
Creation date
9/14/2015 8:25:18 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 09-15-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
RES-2015-048 Resolution for adopting Criteria for Design-Build Delivery Method for Construction Contract
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 5. A good-faith effort to comply with historically underutilized business participation requirements <br /> (NCGS 143-128.2, NCGS 143-128.4), and to recruit and select small business entities. <br /> The design-build delivery method may be used if it is determined that, for the project, <br /> requirements will be imposed which ensure that contractors will comply with the M/WBE goals <br /> adopted by the Board of Commissioners. <br /> 6. The criteria utilized by the County, including a comparison of the advantages and disadvantages <br /> of using the design-build delivery method in lieu of traditional construction and bidding methods. <br /> The criteria utilized by Orange County when considering Design-Build delivery method for each <br /> project are as follows: <br /> 1. The project is well defined, including qualitative and quantitative characteristics, and possesses <br /> one or more unique element that would benefit from the design-build delivery method; <br /> 2. The project timeline is an important factor in making the facility operational within a short <br /> timeframe so as not to excessively burden County operations; <br /> 3. The County has experienced staff and adequate resources to assure that a high quality project <br /> can be delivered within the budget appropriated by the Board of Orange County <br /> Commissioners; <br /> 4. There is a maximum budget that must be adhered to in order to allow negotiations and flexibility <br /> to make appropriate decisions on scope as the project progresses; <br /> 5. It will be necessary to have partial occupancy of a portion of the facility and/or site while the <br /> project construction is ongoing; <br /> 6. The project requires good-faith efforts to comply with historically underutilized business <br /> participation requirements (NCGS 143-128.2, NCGS 143-128.4), and to recruit and select small <br /> business entities; <br /> 7. As a result of a more integrated, fluid and flexible delivery process, the design-build delivery <br /> method meets the operational goals established for the facility, the desired level of quality of the <br /> finished product, and is a comparatively more desirable delivery method over traditional <br /> construction and bidding methods. <br />
The URL can be used to link to this page
Your browser does not support the video tag.